| Customer | Baosteel Baoshan base |
| Inspection dates | 26–28 October 2021 |
| Scope | Documents, dimensions, operation and appearance |
| Milestone | Factory A-inspection passed |
Inspection reviews records and assembled structures
The customer team examined self-inspection records, material reports, non-destructive examination reports and component certificates. Measurements covered trolley and bridge structures and the assembled mechanisms.
Powered tests check mechanisms and electrical systems
The programme included powered operation of hoisting, bridge travel, trolley travel and electrical systems. Process, technical, quality and production personnel supported the inspection.
For an ordered crane, agree the document schedule, witness points and operating tests before factory release. Site assembly and commissioning should follow their own project acceptance plan.