Skip to content
Henan mine crane co., ltd. Get a project quote
RUBBER-TIRED / MODULAR BUILDINGS

Building Straddle Carrier

Lift and carry complete modular building units between fabrication, storage and trailer-loading positions.

LOAD
Project rated
HANDLING
Completed building module
TRAVEL
Rubber tires
QUOTE
Site matched
Use this carrier when a completed module must travel beneath its lifting frame through a factory or yard.

Get a configuration and price matched to your load, dimensions, operating cycle and delivery destination.

MINIMUM ORDERConfirm the order scope
CERTIFICATIONDocuments for your destination
LEAD TIMEConfirmed after configuration approval
Blue rubber-tired straddle carrier supporting a complete enclosed building module beneath a lifting frame
Modular-building unit handling
02 / APPLICATIONS

Where the Building Straddle Carrier fits.

Use this carrier when a completed module must travel beneath its lifting frame through a factory or yard.

MODULE FACTORY

Move a finished unit from the assembly line

Match lifting lugs and permitted module reactions.

YARD STORAGE

Place modules on supports

Check under-clearance and support spacing.

DISPATCH

Load a transport trailer

Dimension trailer deck height and approach space.

When to compare a different arrangement

  • The building cannot be lifted at the proposed points.
  • The loaded carrier cannot pass the narrowest gate or turn.
  • The floor or slab has no verified tire-load capacity.
01 / SPECIFICATIONS

Specifications for the Building Carrier selection.

The technical offer should state the rated load basis, complete lifting tool, operating envelope, duty and governing site reactions for your order.

Compare the specifications and selection requirements

ParameterReference selection rangeProcurement check
Product / arrangementBuilding Straddle CarrierConfirm the exact machine and lifting device in the offered drawing.
Handled loadCompleted building moduleInclude the attachment and rigging in the complete suspended mass.
Clear width / operating envelopeSet from the approved site and load drawingShow the whole route, not only the pickup point.
Lifting height / under-clearanceSet from pickup, travel and placementInclude load depth, spreader or beam and safe clearance.
Duty / handling cycleSelect from lifts, loaded distance and shiftsState typical and maximum loads plus moves per hour.
Complete suspended loadModule + spreader + riggingUse the heaviest finished module, not only frame weight.
Clear width and under-clearanceSelected from module envelopeAllow for facade, roof and temporary fixtures.
Steering and routeSelected from surveyed pathCheck doors, intersections and crossfall.
Tire reactions / routeCalculated for the final selected machineCheck governing loaded, travel, braking and parked cases.

What the final drawing must show: Rated load · clear width · lift and under-clearance · tire reactions · steering, brakes and controls

EQUIPMENT VIEWS

Review the equipment and configuration views.

Blue rubber-tired straddle carrier supporting a complete enclosed building module beneath a lifting frame
Modular-building unit handling
03 / CONFIGURATION

Size the Building Straddle Carrier for your site.

Send the heaviest load and its lifting points together with a dimensioned route. The quotation should state the selected machine, module lifting beam and approved lifting lugs, site reactions and acceptance method.

01 / PROJECT INPUT

Load and tool

Provide the completed building module, attachment mass, lifting points and centre of gravity.

02 / PROJECT INPUT

Coverage

Mark module dimensions, factory door, turns and trailer station on a drawing.

03 / PROJECT INPUT

Operating cycle

State loaded moves per hour, shifts, distances and required placement accuracy.

04 / PROJECT INPUT

Site interface

Provide bearing capacity, power, climate, access and destination requirements.

04 / QUOTATION SCOPE

Buy the complete Building Straddle Carrier package.

Ask each bidder to quote the same lifting arrangement, site interface, tests and dispatch milestone.

01

Approved machine and site reactions

Request the GA, rated configuration, module dimensions, factory door, turns and trailer station and governing reactions.

02

Named crane, tool and controls

List the module lifting beam and approved lifting lugs, drives, braking, control and protection as included or excluded.

03

Defined tests and delivery

Set approved module lift points, route survey, loaded travel and placement test, freight, site services and dispatch date in the contract.

05 / ORDERING & DELIVERY

Order with clear documents and delivery milestones.

Align the selected equipment, technical documents, factory dispatch and site responsibilities before placing your order.

MINIMUM ORDER

Confirm the order scope

Request a quotation for one crane or a complete project package; confirm the minimum order for the selected configuration.

CERTIFICATION

Documents for your destination

Agree the documents for the quoted crane and destination: applicable conformity documents, inspection and test records, operating manuals and the approved technical schedule.

LEAD TIME

Confirmed after configuration approval

Agree drawing approval, fabrication, machinery and control integration, factory testing, transport and commissioning milestones for the selected handling system.

Documentation & acceptance

  • Approved general arrangement and installation dimensions
  • Rated-load and operating configuration
  • Support reactions and interface requirements
  • Applicable inspection records and certificates
  • Operating, maintenance and electrical documents
  • Agreed factory and site acceptance procedures

Specify the documents required for your equipment, destination and site approval in the technical offer.

  1. 01

    Configuration & drawing approval

    Agree the load cases, dimensions, operating envelope and supply schedule.

  2. 02

    Manufacture & factory inspection

    Set the inspection scope, acceptance criteria and customer witness points.

  3. 03

    Packing & dispatch

    Confirm transport dimensions, shipping route, packing list and unloading access.

  4. 04

    Installation & handover

    Agree site readiness, commissioning, load testing and operator training.

WARRANTY & AFTER-SALES

Plan support before the equipment arrives.

Request a written warranty schedule identifying the steel structure, drives, controls, power system and lifting attachment, with destination service and wear-part terms.

Request service and warranty terms ↗
TECHNICAL SUPPORT

Installation, maintenance & parts

Include commissioning support, operator training, fault diagnosis and a critical-spares list. Define response arrangements and any on-site technician scope before the order.

SITE RESPONSIBILITIES

Define your handover scope

Identify the equipment and personnel needed for unloading, installation and commissioning. Put responsibilities and acceptance requirements in the agreed project schedule.

07 / BUYER QUESTIONS

Building Carrier purchasing questions, answered.

Check the selection, commercial scope and installation requirements before ordering.

Can a standard carrier lift any modular house?

No. The module designer must approve pick points, load distribution and allowable deformation before the lifting package is selected.

What is the minimum order?

Ask for a quotation for one complete machine. Confirm the commercial minimum and exactly which attachments and services are included.

Which certificates and tests are included?

List the destination-specific compliance documents, factory acceptance test and site load or travel tests in the purchase specification.

How long will delivery take?

Request a dated factory dispatch commitment measured from deposit and approved drawings; show freight, erection and commissioning separately.

YOUR NEXT LIFT STARTS HERE

Send your Building Straddle Carrier project brief.

Share your load and module dimensions, factory door, turns and trailer station, operating cycle, site conditions and destination. Ask for a matched GA drawing, reaction schedule, equipment list, tests and dated commercial offer.

Discuss your project
Start with these project details
  • 01 Maximum complete module mass and dimensions
  • 02 Approved lugs and centre of gravity
  • 03 Factory door and minimum route width
  • 04 Pickup, storage and trailer heights
  • 05 Moves per shift and route distance
  • 06 Floor loading and destination
↑
Building Straddle CarrierRequest your project quotation
Get a quotation ↗
Product image gallery
Enlarged product image