Move a finished unit from the assembly line
Match lifting lugs and permitted module reactions.
Bridge cranes for workshops and production lines.
Explore Overhead Cranes
Ground-supported lifting for yards and construction.
Explore Gantry Cranes
Wire rope and chain hoists for lifting points and cranes.
Explore Electric Hoists

Wire rope lifting and pulling with a powered drum.
Explore Electric Winches
Grab buckets, magnets and hooks for your load.
Explore Lifting Attachments & Grabs
Mobile handling for containers, precast and yard loads.
Explore Rubber-Tired Gantry Cranes & Straddle Carriers

Lift and move vessels through boatyards and marinas.
Explore Marine Travel Lifts
Ladle, slab, scrap and coil handling across steel production.

Container stacking and cargo transfers across terminals and rail.

Turbine installation, powerhouse maintenance and wind equipment assembly.

Controlled component transfer and positioning for precision assembly.

Heavy fabrication, production lifting and factory crane automation.

Process lifting for smelters, carbon blocks and anode materials.

Clean lifting and classified protection for sensitive process areas.

Bridge fabrication, metro construction and ship block assembly.

Automated storage and retrieval for plates, cables and bins.

Follow project dispatches, crane engineering and factory acceptance.

Dispatch, installation and equipment in service

Crane configurations and handling technology

Factory inspections, acceptance and test programmes

Company developments, people and community programmes
Lift and carry complete modular building units between fabrication, storage and trailer-loading positions.
Get a configuration and price matched to your load, dimensions, operating cycle and delivery destination.

Use this carrier when a completed module must travel beneath its lifting frame through a factory or yard.
Match lifting lugs and permitted module reactions.
Check under-clearance and support spacing.
Dimension trailer deck height and approach space.
The technical offer should state the rated load basis, complete lifting tool, operating envelope, duty and governing site reactions for your order.
Compare the specifications and selection requirements
| Parameter | Reference selection range | Procurement check |
|---|---|---|
| Product / arrangement | Building Straddle Carrier | Confirm the exact machine and lifting device in the offered drawing. |
| Handled load | Completed building module | Include the attachment and rigging in the complete suspended mass. |
| Clear width / operating envelope | Set from the approved site and load drawing | Show the whole route, not only the pickup point. |
| Lifting height / under-clearance | Set from pickup, travel and placement | Include load depth, spreader or beam and safe clearance. |
| Duty / handling cycle | Select from lifts, loaded distance and shifts | State typical and maximum loads plus moves per hour. |
| Complete suspended load | Module + spreader + rigging | Use the heaviest finished module, not only frame weight. |
| Clear width and under-clearance | Selected from module envelope | Allow for facade, roof and temporary fixtures. |
| Steering and route | Selected from surveyed path | Check doors, intersections and crossfall. |
| Tire reactions / route | Calculated for the final selected machine | Check governing loaded, travel, braking and parked cases. |
What the final drawing must show: Rated load · clear width · lift and under-clearance · tire reactions · steering, brakes and controls
Send the heaviest load and its lifting points together with a dimensioned route. The quotation should state the selected machine, module lifting beam and approved lifting lugs, site reactions and acceptance method.
Provide the completed building module, attachment mass, lifting points and centre of gravity.
Mark module dimensions, factory door, turns and trailer station on a drawing.
State loaded moves per hour, shifts, distances and required placement accuracy.
Provide bearing capacity, power, climate, access and destination requirements.
Ask each bidder to quote the same lifting arrangement, site interface, tests and dispatch milestone.
Request the GA, rated configuration, module dimensions, factory door, turns and trailer station and governing reactions.
List the module lifting beam and approved lifting lugs, drives, braking, control and protection as included or excluded.
Set approved module lift points, route survey, loaded travel and placement test, freight, site services and dispatch date in the contract.
Align the selected equipment, technical documents, factory dispatch and site responsibilities before placing your order.
Request a quotation for one crane or a complete project package; confirm the minimum order for the selected configuration.
Agree the documents for the quoted crane and destination: applicable conformity documents, inspection and test records, operating manuals and the approved technical schedule.
Agree drawing approval, fabrication, machinery and control integration, factory testing, transport and commissioning milestones for the selected handling system.
Specify the documents required for your equipment, destination and site approval in the technical offer.
Agree the load cases, dimensions, operating envelope and supply schedule.
Set the inspection scope, acceptance criteria and customer witness points.
Confirm transport dimensions, shipping route, packing list and unloading access.
Agree site readiness, commissioning, load testing and operator training.
Request a written warranty schedule identifying the steel structure, drives, controls, power system and lifting attachment, with destination service and wear-part terms.
Request service and warranty terms ↗Include commissioning support, operator training, fault diagnosis and a critical-spares list. Define response arrangements and any on-site technician scope before the order.
Identify the equipment and personnel needed for unloading, installation and commissioning. Put responsibilities and acceptance requirements in the agreed project schedule.
Review related equipment against your load, site geometry and operating cycle.
Check the selection, commercial scope and installation requirements before ordering.
No. The module designer must approve pick points, load distribution and allowable deformation before the lifting package is selected.
Ask for a quotation for one complete machine. Confirm the commercial minimum and exactly which attachments and services are included.
List the destination-specific compliance documents, factory acceptance test and site load or travel tests in the purchase specification.
Request a dated factory dispatch commitment measured from deposit and approved drawings; show freight, erection and commissioning separately.
Share your load and module dimensions, factory door, turns and trailer station, operating cycle, site conditions and destination. Ask for a matched GA drawing, reaction schedule, equipment list, tests and dated commercial offer.
Discuss your project