Documents and physical measurements reviewed
The inspection team examined self-inspection records, material reports and non-destructive testing records. Checks covered main-girder span, brake-wheel runout, wheel-tread hardness and travel mechanisms.
Project, process, technical, quality and production teams coordinated the acceptance activities.
Agree the factory acceptance package
For a crane order, define which records and dimensional or functional checks are required before shipment. Confirm the inspection procedure and witness responsibilities with the equipment specification.


