Factory Quality Review Emphasises Control of Nonconforming Equipment
Henan Mine Crane
Henan Mine Crane held a manufacturing-quality meeting on 14 June 2022 focused on preventing defective equipment from leaving the factory.
Factory quality meeting and review of nonconforming crane equipment.
Checks before the next production stage
The event included the scrapping of nonconforming equipment and a review of quality responsibilities across management and workshop teams. The programme called for detailed checks at each process stage.
For customers, an agreed inspection plan sets out manufacturing checks, acceptance criteria and how nonconformities are resolved before release. Confirm the required records with the technical scope.
Send the load including attachments, span, lifting height, operating duty and destination. Include your layout, required standards and delivery schedule so our team can review the crane configuration and quotation scope.