| Application | Underground pumping-station unit installation |
| Featured capacity | 125 t |
| Controls | PLC and variable-frequency communications |
| Lifting function | Multi-point synchronisation |
| Information system | Coordinates, alarms, records and communications |
Controlled lifting within an underground facility
PLC and inverter communications coordinate mechanism movement. Multi-point synchronous control adjusts the lifting arrangement for the specified load and handling sequence.
The hoist supports four-quadrant operation and controlled low-speed torque. The equipment configuration addresses the installation task within the station’s available working space.
Fault and operating information for the team
A comprehensive detection system displays three-dimensional coordinates, operating signals, protective signals and fault information. Its functions include diagnosis, alarms, records, printing and communications.
The operating team can use the agreed displays and records within commissioning and maintenance procedures.
Define the unit geometry and installation route
Provide the heaviest unit, lifting-point drawings, centre of gravity and required travel path. Include headroom, maintenance access and the supporting-structure layout.
Acceptance should demonstrate the agreed lifting and positioning sequence, including coordinated lifting points where required. The technical offer can then be reviewed against the pumping station’s installation needs.