Dispatch date5 April 2025
Rated capacity550 t
StructureDouble-girder overhead crane
ApplicationNuclear-power project
FunctionsPLC, variable-frequency drives, energy recovery and anti-sway

Drive and control functions for heavy lifting

The crane uses variable-frequency speed regulation across the machine. PLC control coordinates the equipment, while anti-sway functions support controlled movement of the suspended load.

An energy-feedback function returns regenerative electrical energy to the supply during applicable operating movements. Its contribution to consumption depends on the crane’s actual load and movement cycle.

A factory dispatch milestone

The April event marked release of the crane from the manufacturing site. Transportation, site assembly and commissioning follow the receiving project’s delivery programme.

The equipment’s rated capacity is 550 t. The load interface, building geometry and operating sequence form additional requirements for the installed handling arrangement.

Define the nuclear-project acceptance scope

A new enquiry should include the load drawings, lifting points, handling path, required controls and project documentation. Identify the applicable inspection and acceptance requirements within the order.

The technical offer can then establish the crane configuration and review stages for the facility’s actual handling task.