Skip to content
CRANE MANUFACTURER SINCE 2002
info@hnksglobal.com+86 188 3620 7779Project enquiry ↗
Henan Mine Crane Request a quote
Crane application in warehousing and logistics from Henan Mine Crane's warehousing and logistics application case
PORTS & LOGISTICS / LIFTING SOLUTIONS

Minus 40 C Automated Rail Container Gantry Solution

High-frequency container handling at a northern rail project must account for material behavior and controls at temperatures down to minus 40 degrees Celsius.

Henan Mine Crane equipment for International rail container project

THE LIFTING SOLUTION

Keep container transfer available in an extreme-cold rail terminal.

High-frequency container handling at a northern rail project must account for material behavior and controls at temperatures down to minus 40 degrees Celsius.

Specify the gantry as a cold-climate operating system: structure and components for low temperature, A8 duty, all-variable-frequency drives, accurate positioning and yard-data integration. Validate the whole cycle at the operating temperature.

HANDLING SEQUENCE

How the solution works.

Follow the load through the operation to see where lifting equipment, tooling and controls must work together.

01

Receive the task

Assign container identity and destination from the terminal system.

02

Transfer at speed

Coordinate gantry travel, spreader engagement and energy-regenerative drives.

03

Confirm the stack

Use GPS positioning and automated control to record the set-down location.

ENGINEERING DECISIONS

What determines the final configuration?

These choices affect safety, process fit and the operating life of the installation.

01

Cold-weather design

Check materials, electrical cabinets and service practices against the minimum site temperature.

02

High-frequency duty

Verify the expected cycles per hour and the A8 working requirement.

DELIVERED PROJECTS

Experience on real jobs.

See how cranes and lifting systems were configured for demanding operating environments.

Crane application in warehousing and logistics from Henan Mine Crane's warehousing and logistics application case
PROJECT 01

International rail container project

An automated container gantry completed load testing for an overseas rail project. Its configuration included A8 duty, minus 40 C operation, ACCS control and GPS positioning.

RELEVANT EQUIPMENT

Equipment options for this solution.

These product families support the handling tasks above. The final crane and attachment are selected from the site brief.

SPECIFICATION BRIEF

What we need to size your crane.

Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.

Prepare your enquiry ↗
  1. 01Lowest ambient temperature
  2. 02Container mix and gross load
  3. 03Rail gauge, lanes and stack height
  4. 04Peak cycles and data interfaces
NEXT STEP

Tell us what your crane needs to lift.

Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.

Start a project enquiry ↗