Skip to content
CRANE MANUFACTURER SINCE 2002
info@hnksglobal.com+86 188 3620 7779Project enquiry ↗
Henan Mine Crane Request a quote
Crane application in industrial manufacturing from Henan Mine Crane's industrial manufacturing application case
STEEL & METALLURGY / LIFTING SOLUTIONS

Hot Slab Clamp Crane Handling Solution

Slabs leaving steel production can exceed 650 C, making the clamp, structure and control system part of the thermal risk plan.

Henan Mine Crane equipment for Shandong Iron and Steel Rizhao slab-handling project

THE LIFTING SOLUTION

Grip and position hot slabs without exposing a worker beneath the load.

Slabs leaving steel production can exceed 650 C, making the clamp, structure and control system part of the thermal risk plan.

Use an adjustable slab clamp matched to slab width and a double-trolley crane arrangement suited to the lifting sequence. Guided movement, digital speed control and monitoring support precise pickup and set-down in the hot bay.

HANDLING SEQUENCE

How the solution works.

Follow the load through the operation to see where lifting equipment, tooling and controls must work together.

01

Measure the slab

Check width, thickness, temperature and surface condition before choosing the clamp.

02

Grip and transfer

Verify clamp engagement and load balance while moving through the bay.

03

Release in stack

Position the slab over its support and confirm the planned release.

ENGINEERING DECISIONS

What determines the final configuration?

These choices affect safety, process fit and the operating life of the installation.

01

Thermal exposure

Select material and component protection for the hot-slab temperature range.

02

Future automation

Reserve weighing, sensing and positioning data interfaces where required.

DELIVERED PROJECTS

Experience on real jobs.

See how cranes and lifting systems were configured for demanding operating environments.

Crane application in industrial manufacturing from Henan Mine Crane's industrial manufacturing application case
PROJECT 01

Shandong Iron and Steel Rizhao slab-handling project

A 50+50 t slab-clamp crane entered service at the Rizhao steel base, using adjustable clamps, monitoring, weighing and digital speed control for slabs that can exceed 650 C.

RELEVANT EQUIPMENT

Equipment options for this solution.

These product families support the handling tasks above. The final crane and attachment are selected from the site brief.

SPECIFICATION BRIEF

What we need to size your crane.

Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.

Prepare your enquiry ↗
  1. 01Slab size and maximum temperature
  2. 02Clamp and trolley geometry
  3. 03Stack and runway drawings
  4. 04Monitoring and automation interfaces
NEXT STEP

Tell us what your crane needs to lift.

Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.

Start a project enquiry ↗