Stage the girder
Plan load pickup and temporary support for the changing box-girder section.
A long bridge segment may need a crane to span roads, river-adjacent work and wide temporary assembly zones.
Henan Mine Crane equipment for Jianzhou Bridge construction
A long bridge segment may need a crane to span roads, river-adjacent work and wide temporary assembly zones.
Set the 72 m crane span from the box-girder fabrication route and site obstructions. Check runway alignment, wind exposure, rigging and placement sequence before any heavy segment is moved.
Follow the load through the operation to see where lifting equipment, tooling and controls must work together.
Plan load pickup and temporary support for the changing box-girder section.
Verify clearance over roadway and site obstacles.
Align the steel segment with the next assembly support.
These choices affect safety, process fit and the operating life of the installation.
Check deflection and wheel loads under the heaviest segment.
Define weather limits and protected personnel routes.
See how cranes and lifting systems were configured for demanding operating environments.

A 72 m-span crane supported construction of the 580.5 m Jianzhou Bridge, which uses a variable-section continuous welded steel-box girder.
These product families support the handling tasks above. The final crane and attachment are selected from the site brief.
Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.
Prepare your enquiry ↗Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.
Start a project enquiry ↗