Crane application in construction and infrastructure from Henan Mine Crane's construction and infrastructure application case
INFRASTRUCTURE / LIFTING SOLUTIONS

Bridge Caisson Spoil Removal Gantry Solution

A large bridge caisson needs continuous spoil removal from confined cells without blocking the excavation equipment or surface logistics.

Henan Mine Crane equipment for Changtai Yangtze River Bridge caisson

THE LIFTING SOLUTION

Coordinate gantry lifting with automated caisson excavation.

A large bridge caisson needs continuous spoil removal from confined cells without blocking the excavation equipment or surface logistics.

Place gantries over the caisson work zone and define how each spoil container is presented by the excavation system, lifted and discharged. Coordinate crane tasks with the automated cutter-suction equipment and caisson sinking sequence.

HANDLING SEQUENCE

How the solution works.

Follow the load through the operation to see where lifting equipment, tooling and controls must work together.

01

Collect from the cell

Confirm container or grab interface at the excavation point.

02

Lift clear of the caisson

Keep the vertical path separated from personnel and equipment.

03

Discharge at surface

Route spoil to a vehicle or stockpile without interrupting the next excavation cycle.

ENGINEERING DECISIONS

What determines the final configuration?

These choices affect safety, process fit and the operating life of the installation.

01

Robot interface

Define signals and exclusion zones between gantry and excavation equipment.

02

Temporary works

Check gantry rails and support changes as the caisson sinks.

DELIVERED PROJECTS

Experience on real jobs.

See how cranes and lifting systems were configured for demanding operating environments.

Crane application in construction and infrastructure from Henan Mine Crane's construction and infrastructure application case
PROJECT 01

Changtai Yangtze River Bridge caisson

Multiple gantries supported the Changtai bridge project alongside intelligent cutter-suction equipment for single-cell steel-caisson spoil removal.

RELEVANT EQUIPMENT

Equipment options for this solution.

These product families support the handling tasks above. The final crane and attachment are selected from the site brief.

SPECIFICATION BRIEF

What we need to size your crane.

Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.

Prepare your enquiry ↗
  1. 01Spoil load and container size
  2. 02Caisson cell geometry
  3. 03Temporary rail/support design
  4. 04Robot-to-crane sequencing
NEXT STEP

Tell us what your crane needs to lift.

Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.