Distribute the lift along the workpiece
Choose pickup spacing and attachment count around the steel length, mass distribution and allowed deflection.
Bridge cranes for workshops and production lines.
Explore Overhead Cranes
Ground-supported lifting for yards and construction.
Explore Gantry Cranes
Wire rope and chain hoists for lifting points and cranes.
Explore Electric Hoists

Wire rope lifting and pulling with a powered drum.
Explore Electric Winches
Grab buckets, magnets and hooks for your load.
Explore Lifting Attachments & Grabs
Mobile handling for containers, precast and yard loads.
Explore Rubber-Tired Gantry Cranes & Straddle Carriers

Lift and move vessels through boatyards and marinas.
Explore Marine Travel Lifts
Ladle, slab, scrap and coil handling across steel production.

Container stacking and cargo transfers across terminals and rail.

Turbine installation, powerhouse maintenance and wind equipment assembly.

Controlled component transfer and positioning for precision assembly.

Heavy fabrication, production lifting and factory crane automation.

Process lifting for smelters, carbon blocks and anode materials.

Clean lifting and classified protection for sensitive process areas.

Bridge fabrication, metro construction and ship block assembly.

Automated storage and retrieval for plates, cables and bins.

Follow project dispatches, crane engineering and factory acceptance.

Dispatch, installation and equipment in service

Crane configurations and handling technology

Factory inspections, acceptance and test programmes

Company developments, people and community programmes
Carry long steel sections with a carrier beam and distributed lifting points. A carrier beam distributes pickup points along the steel load. Beam orientation, attachment spacing and the complete load envelope are defined in the general arrangement. Select the number of attachments, their spacing and retention behavior for the actual steel section.
Get a configuration and price matched to your load, dimensions, operating cycle and delivery destination.

A carrier beam distributes pickup points along the steel load. Beam orientation, attachment spacing and the complete load envelope are defined in the general arrangement. Select the number of attachments, their spacing and retention behavior for the actual steel section.
Choose pickup spacing and attachment count around the steel length, mass distribution and allowed deflection.
Set the beam orientation in the general arrangement and verify clearance over stock, vehicles and fixed equipment along the route.
Match the attachment to the steel surface and destination fixture. Check the complete load, beam depth and useful hook travel.
The figures below describe catalogue configurations. Select capacity, span, duty and mechanisms as one combination on an approved drawing.
Compare the specifications and selection requirements
| Parameter | Reference selection range | Procurement check |
|---|---|---|
| Detailed Configurations | 5+5 / 7.5+7.5 / 10+10 / 16+16 t | Confirm each lifting point rating, complete suspended load and permitted combined lifting cases. |
| Span | 10.5–31.5 m | Confirm the runway rail centre-to-centre span on the approved general arrangement drawing. |
| Maximum Lifting Height | 16 m | Confirm the required vertical hook travel, upper hook position and hook approach for the load route. |
| Working Class | A5–A6 | Select the duty class for the load spectrum, operating hours and handling frequency. |
| 5+5 t Hoisting Speed | 12.5 m/min (A5); 15.66 m/min (A6) | Confirm the 5+5 t hoisting speed for the selected duty class and positioning requirement. |
| 7.5+7.5 t Hoisting Speed | 10.4 m/min (A5); 15.3 m/min (A6) | Confirm the 7.5+7.5 t hoisting speed for the selected duty class and positioning requirement. |
| 10+10 t Hoisting Speed | 10.4 m/min (A5); 15.2 m/min (A6) | Confirm the 10+10 t hoisting speed for the selected duty class and positioning requirement. |
| 16+16 t Hoisting Speed | 9.8 m/min (A5); 13.6 m/min (A6) | Confirm the 16+16 t hoisting speed for the selected duty class and positioning requirement. |
| Trolley Travel Speed | 42.4–44.6 m/min by capacity | Confirm trolley speed, available travel and stopping position for the handling route. |
| Bridge Travel Speed | Approx. 74.2–116.8 m/min by duty, capacity and span | Confirm bridge speed, runway travel and stopping requirements for the selected duty and span. |
What the final drawing must show: Rated load · rail-centre span · lift and hook approach · crane dimensions · wheel loads · selected mechanism and controls
For steel stock, long profiles and material transfer, show pickup, travel and set-down locations on one drawing. Request hook envelope, reactions and the selected mechanism in the technical offer.
Include payload, rigging and any attachment or carrier beam.
Mark rail centres, lift, approach distances, obstacles and travel length.
State loads per cycle, cycles per hour, shifts and required positioning.
Provide runway or foundation capacity, power and destination requirements.
Require the same load case, approved layout, equipment list and delivery milestone from every supplier.
Request a general arrangement, hook coverage, wheel loads and support interface.
List bridge or portal, hoist or trolley, attachment, drives, brakes, limits and overload protection.
Separate factory inspection, dispatch, freight, installation, site load test and operator documents.
Align the selected equipment, technical documents, factory dispatch and site responsibilities before placing your order.
Request a quotation for one crane or a complete project package; confirm the minimum order for the selected configuration.
Agree the documents for the quoted crane and destination: applicable conformity documents, inspection and test records, operating manuals and the approved technical schedule.
Agree drawing approval, fabrication, machinery and control integration, factory testing, transport and commissioning milestones for the selected handling system.
Specify the documents required for your equipment, destination and site approval in the technical offer.
Agree the load cases, dimensions, operating envelope and supply schedule.
Set the inspection scope, acceptance criteria and customer witness points.
Confirm transport dimensions, shipping route, packing list and unloading access.
Agree site readiness, commissioning, load testing and operator training.
Request a written warranty schedule identifying the steel structure, drives, controls, power system and lifting attachment, with destination service and wear-part terms.
Request service and warranty terms ↗Include commissioning support, operator training, fault diagnosis and a critical-spares list. Define response arrangements and any on-site technician scope before the order.
Identify the equipment and personnel needed for unloading, installation and commissioning. Put responsibilities and acceptance requirements in the agreed project schedule.
Review related equipment against your load, site geometry and operating cycle.
Check the selection, commercial scope and installation requirements before ordering.
No. The pickup points, load sharing and complete beam weight govern the permissible lift.
The load’s orientation, attachment spacing and approach to storage positions must fit the bay.
Request a quotation for one crane or a project package; the offer should state the minimum quantity and complete supply scope.
Ask for calendar days from deposit and approved drawings to factory dispatch, with freight and site work shown separately.
Share the complete load, arrangement, rail centres, lift, duty, site conditions, destination and required delivery scope. We can return a model-specific drawing, selected specifications and a dated quotation.
Discuss your project