Skip to content
Henan mine crane co., ltd. Get a project quote
PARALLEL BEAM / ELECTROMAGNETIC OVERHEAD CRANES

Parallel Carrier-Beam Overhead Crane

Carry long steel sections with a carrier beam and distributed lifting points. A carrier beam distributes pickup points along the steel load. Beam orientation, attachment spacing and the complete load envelope are defined in the general arrangement. Select the number of attachments, their spacing and retention behavior for the actual steel section.

CONFIGURATIONS
5+5 to 16+16 t
SPAN
10.5–31.5 m
LIFT
up to 16 m
DUTY
A5–A6
parallel carrier-beam crane · steel stock, long profiles and material transfer · engineered to the actual site

Get a configuration and price matched to your load, dimensions, operating cycle and delivery destination.

MINIMUM ORDERConfirm the order scope
CERTIFICATIONDocuments for your destination
LEAD TIMEConfirmed after configuration approval
Yellow double-girder overhead crane with a carrier beam suspended from two lifting points above long steel stock
Carrier-beam crane in a steel workshop
02 / APPLICATIONS

Where the parallel carrier-beam crane fits the lifting task.

A carrier beam distributes pickup points along the steel load. Beam orientation, attachment spacing and the complete load envelope are defined in the general arrangement. Select the number of attachments, their spacing and retention behavior for the actual steel section.

LONG STEEL STOCK

Distribute the lift along the workpiece

Choose pickup spacing and attachment count around the steel length, mass distribution and allowed deflection.

WAREHOUSE TRANSFER

Carry sections through a defined bay

Set the beam orientation in the general arrangement and verify clearance over stock, vehicles and fixed equipment along the route.

PRODUCTION FEED

Position material for the next process

Match the attachment to the steel surface and destination fixture. Check the complete load, beam depth and useful hook travel.

When to compare a different arrangement

  • The complete suspended load or operating cycle has not been established.
  • The runway or foundation cannot carry the approved wheel loads.
  • The attachment, clearance or control scheme does not match the actual load path.
01 / SPECIFICATIONS

Specifications for the Parallel Beam selection.

The figures below describe catalogue configurations. Select capacity, span, duty and mechanisms as one combination on an approved drawing.

Compare the specifications and selection requirements

ParameterReference selection rangeProcurement check
Detailed Configurations5+5 / 7.5+7.5 / 10+10 / 16+16 tConfirm each lifting point rating, complete suspended load and permitted combined lifting cases.
Span10.5–31.5 mConfirm the runway rail centre-to-centre span on the approved general arrangement drawing.
Maximum Lifting Height16 mConfirm the required vertical hook travel, upper hook position and hook approach for the load route.
Working ClassA5–A6Select the duty class for the load spectrum, operating hours and handling frequency.
5+5 t Hoisting Speed12.5 m/min (A5); 15.66 m/min (A6)Confirm the 5+5 t hoisting speed for the selected duty class and positioning requirement.
7.5+7.5 t Hoisting Speed10.4 m/min (A5); 15.3 m/min (A6)Confirm the 7.5+7.5 t hoisting speed for the selected duty class and positioning requirement.
10+10 t Hoisting Speed10.4 m/min (A5); 15.2 m/min (A6)Confirm the 10+10 t hoisting speed for the selected duty class and positioning requirement.
16+16 t Hoisting Speed9.8 m/min (A5); 13.6 m/min (A6)Confirm the 16+16 t hoisting speed for the selected duty class and positioning requirement.
Trolley Travel Speed42.4–44.6 m/min by capacityConfirm trolley speed, available travel and stopping position for the handling route.
Bridge Travel SpeedApprox. 74.2–116.8 m/min by duty, capacity and spanConfirm bridge speed, runway travel and stopping requirements for the selected duty and span.

What the final drawing must show: Rated load · rail-centre span · lift and hook approach · crane dimensions · wheel loads · selected mechanism and controls

EQUIPMENT VIEWS

Review the equipment and configuration views.

Yellow double-girder overhead crane with a carrier beam suspended from two lifting points above long steel stock
Carrier-beam crane in a steel workshop
Complete manufacturer technical sheet showing an overhead crane with the carrier beam parallel to its main girders
Parallel carrier-beam arrangement — Technical drawing
03 / CONFIGURATION

Map the load route before fixing the model.

For steel stock, long profiles and material transfer, show pickup, travel and set-down locations on one drawing. Request hook envelope, reactions and the selected mechanism in the technical offer.

01 / PROJECT INPUT

Complete load

Include payload, rigging and any attachment or carrier beam.

02 / PROJECT INPUT

Geometry

Mark rail centres, lift, approach distances, obstacles and travel length.

03 / PROJECT INPUT

Service

State loads per cycle, cycles per hour, shifts and required positioning.

04 / PROJECT INPUT

Site interface

Provide runway or foundation capacity, power and destination requirements.

04 / QUOTATION SCOPE

Compare complete parallel carrier-beam crane offers.

Require the same load case, approved layout, equipment list and delivery milestone from every supplier.

01

Approved arrangement and reactions

Request a general arrangement, hook coverage, wheel loads and support interface.

02

Named mechanism and controls

List bridge or portal, hoist or trolley, attachment, drives, brakes, limits and overload protection.

03

Defined test and handover

Separate factory inspection, dispatch, freight, installation, site load test and operator documents.

05 / ORDERING & DELIVERY

Order with clear documents and delivery milestones.

Align the selected equipment, technical documents, factory dispatch and site responsibilities before placing your order.

MINIMUM ORDER

Confirm the order scope

Request a quotation for one crane or a complete project package; confirm the minimum order for the selected configuration.

CERTIFICATION

Documents for your destination

Agree the documents for the quoted crane and destination: applicable conformity documents, inspection and test records, operating manuals and the approved technical schedule.

LEAD TIME

Confirmed after configuration approval

Agree drawing approval, fabrication, machinery and control integration, factory testing, transport and commissioning milestones for the selected handling system.

Documentation & acceptance

  • Approved general arrangement and installation dimensions
  • Rated-load and operating configuration
  • Support reactions and interface requirements
  • Applicable inspection records and certificates
  • Operating, maintenance and electrical documents
  • Agreed factory and site acceptance procedures

Specify the documents required for your equipment, destination and site approval in the technical offer.

  1. 01

    Configuration & drawing approval

    Agree the load cases, dimensions, operating envelope and supply schedule.

  2. 02

    Manufacture & factory inspection

    Set the inspection scope, acceptance criteria and customer witness points.

  3. 03

    Packing & dispatch

    Confirm transport dimensions, shipping route, packing list and unloading access.

  4. 04

    Installation & handover

    Agree site readiness, commissioning, load testing and operator training.

WARRANTY & AFTER-SALES

Plan support before the equipment arrives.

Request a written warranty schedule identifying the steel structure, drives, controls, power system and lifting attachment, with destination service and wear-part terms.

Request service and warranty terms ↗
TECHNICAL SUPPORT

Installation, maintenance & parts

Include commissioning support, operator training, fault diagnosis and a critical-spares list. Define response arrangements and any on-site technician scope before the order.

SITE RESPONSIBILITIES

Define your handover scope

Identify the equipment and personnel needed for unloading, installation and commissioning. Put responsibilities and acceptance requirements in the agreed project schedule.

07 / BUYER QUESTIONS

Parallel Beam purchasing questions, answered.

Check the selection, commercial scope and installation requirements before ordering.

Does 5+5 t equal one unrestricted 10 t hook?

No. The pickup points, load sharing and complete beam weight govern the permissible lift.

What changes when the beam is parallel?

The load’s orientation, attachment spacing and approach to storage positions must fit the bay.

What is the minimum order?

Request a quotation for one crane or a project package; the offer should state the minimum quantity and complete supply scope.

How is lead time confirmed?

Ask for calendar days from deposit and approved drawings to factory dispatch, with freight and site work shown separately.

YOUR NEXT LIFT STARTS HERE

Send the lifting layout. Get a matched parallel carrier-beam crane offer.

Share the complete load, arrangement, rail centres, lift, duty, site conditions, destination and required delivery scope. We can return a model-specific drawing, selected specifications and a dated quotation.

Discuss your project
Start with these project details
  • 01 Complete load and attachment
  • 02 Pickup, travel and set-down layout
  • 03 Span, lift and clearances
  • 04 Cycles per hour and operating shifts
  • 05 Runway or foundation information
  • 06 Destination and delivery scope
↑
Parallel Carrier-Beam Overhead CraneRequest your project quotation
Get a quotation ↗
Product image gallery
Enlarged product image