Skip to content
Henan mine crane co., ltd. Get a project quote
PERPENDICULAR BEAM / ELECTROMAGNETIC OVERHEAD CRANES

Perpendicular Carrier-Beam Overhead Crane

Carry long steel sections across the bridge direction with a transverse lifting beam. A transverse carrier beam changes the load orientation relative to bridge travel. Verify side clearance, beam rotation needs and balanced load sharing across all pickup points.

CONFIGURATIONS
5+5 to 16+16 t
SPAN
10.5–31.5 m
LIFT
up to 16 m
DUTY
A5–A6
perpendicular carrier-beam crane · steel plate and section handling across parallel stock rows · engineered to the actual site

Get a configuration and price matched to your load, dimensions, operating cycle and delivery destination.

MINIMUM ORDERConfirm the order scope
CERTIFICATIONDocuments for your destination
LEAD TIMEConfirmed after configuration approval
Manufacturer rendering of a double-girder overhead crane and two-point carrier-beam lifting assembly
Manufacturer rendering — carrier-beam crane arrangement
02 / APPLICATIONS

Where a perpendicular carrier-beam crane fits the lifting task.

Select the transverse beam orientation from your stock rows, load dimensions and travel clearance. Define any rotation requirement separately and check load sharing at every pickup point.

STEEL SECTIONS

Lift long sections from several points

Match carrier-beam length and pickup spacing to the steel product, centre of gravity and permitted overhang.

STOCK TRANSFER

Move steel between parallel storage rows

Draw the full suspended load across the bridge direction and check the travel corridor against stacks, columns and nearby cranes.

LINE FEEDING

Place long material at production stations

Coordinate pickup orientation, set-down position and attachment selection with the process layout. Define any required rotation separately.

When to compare a different arrangement

  • The complete suspended load or operating cycle has not been established.
  • The runway or foundation cannot carry the approved wheel loads.
  • The attachment, clearance or control scheme does not match the actual load path.
01 / SPECIFICATIONS

Specifications for the Perpendicular Beam selection.

The figures below describe catalogue configurations. Select capacity, span, duty and mechanisms as one combination on an approved drawing.

Compare the specifications and selection requirements

ParameterReference selection rangeProcurement check
Detailed Configurations5+5 / 7.5+7.5 / 10+10 / 16+16 tConfirm each lifting point rating, complete suspended load and permitted combined lifting cases.
Span10.5–31.5 mConfirm the runway rail centre-to-centre span on the approved general arrangement drawing.
Maximum Lifting Height16 mConfirm the required vertical hook travel, upper hook position and hook approach for the load route.
Working ClassA5–A6Select the duty class for the load spectrum, operating hours and handling frequency.
5+5 t Hoisting Speed12.9 m/min (A5); 15.66 m/min (A6)Confirm the 5+5 t hoisting speed for the selected duty class and positioning requirement.
7.5+7.5 t Hoisting Speed10.4 m/min (A5); 15.3 m/min (A6)Confirm the 7.5+7.5 t hoisting speed for the selected duty class and positioning requirement.
10+10 t Hoisting Speed10.4 m/min (A5); 15.2 m/min (A6)Confirm the 10+10 t hoisting speed for the selected duty class and positioning requirement.
16+16 t Hoisting Speed9.8 m/min (A5); 12.4 m/min (A6)Confirm the 16+16 t hoisting speed for the selected duty class and positioning requirement.
Trolley Travel Speed42.4–44.6 m/min by capacityConfirm trolley speed, available travel and stopping position for the handling route.
Bridge Travel SpeedApprox. 74.2–116.8 m/min by duty, capacity and spanConfirm bridge speed, runway travel and stopping requirements for the selected duty and span.

What the final drawing must show: Rated load · rail-centre span · lift and hook approach · crane dimensions · wheel loads · selected mechanism and controls

EQUIPMENT VIEWS

Review the equipment and configuration views.

Complete manufacturer technical sheet showing a carrier-beam crane with its beam perpendicular to the main girders
Perpendicular carrier-beam arrangement — Technical drawing
Complete manufacturer 5 + 5 tonne perpendicular carrier-beam crane table with speeds, dimensions and wheel loads
5 + 5 t perpendicular carrier-beam reference — Technical table
03 / CONFIGURATION

Map the load route before fixing the model.

For steel plate and section handling across parallel stock rows, show pickup, travel and set-down locations on one drawing. Request hook envelope, reactions and the selected mechanism in the technical offer.

01 / PROJECT INPUT

Complete load

Include payload, rigging and any attachment or carrier beam.

02 / PROJECT INPUT

Geometry

Mark rail centres, lift, approach distances, obstacles and travel length.

03 / PROJECT INPUT

Service

State loads per cycle, cycles per hour, shifts and required positioning.

04 / PROJECT INPUT

Site interface

Provide runway or foundation capacity, power and destination requirements.

04 / QUOTATION SCOPE

Compare complete perpendicular carrier-beam crane offers.

Require the same load case, approved layout, equipment list and delivery milestone from every supplier.

01

Approved arrangement and reactions

Request a general arrangement, hook coverage, wheel loads and support interface.

02

Named mechanism and controls

List bridge or portal, hoist or trolley, attachment, drives, brakes, limits and overload protection.

03

Defined test and handover

Separate factory inspection, dispatch, freight, installation, site load test and operator documents.

05 / ORDERING & DELIVERY

Order with clear documents and delivery milestones.

Align the selected equipment, technical documents, factory dispatch and site responsibilities before placing your order.

MINIMUM ORDER

Confirm the order scope

Request a quotation for one crane or a complete project package; confirm the minimum order for the selected configuration.

CERTIFICATION

Documents for your destination

Agree the documents for the quoted crane and destination: applicable conformity documents, inspection and test records, operating manuals and the approved technical schedule.

LEAD TIME

Confirmed after configuration approval

Agree drawing approval, fabrication, machinery and control integration, factory testing, transport and commissioning milestones for the selected handling system.

Documentation & acceptance

  • Approved general arrangement and installation dimensions
  • Rated-load and operating configuration
  • Support reactions and interface requirements
  • Applicable inspection records and certificates
  • Operating, maintenance and electrical documents
  • Agreed factory and site acceptance procedures

Specify the documents required for your equipment, destination and site approval in the technical offer.

  1. 01

    Configuration & drawing approval

    Agree the load cases, dimensions, operating envelope and supply schedule.

  2. 02

    Manufacture & factory inspection

    Set the inspection scope, acceptance criteria and customer witness points.

  3. 03

    Packing & dispatch

    Confirm transport dimensions, shipping route, packing list and unloading access.

  4. 04

    Installation & handover

    Agree site readiness, commissioning, load testing and operator training.

WARRANTY & AFTER-SALES

Plan support before the equipment arrives.

Request a written warranty schedule identifying the steel structure, drives, controls, power system and lifting attachment, with destination service and wear-part terms.

Request service and warranty terms ↗
TECHNICAL SUPPORT

Installation, maintenance & parts

Include commissioning support, operator training, fault diagnosis and a critical-spares list. Define response arrangements and any on-site technician scope before the order.

SITE RESPONSIBILITIES

Define your handover scope

Identify the equipment and personnel needed for unloading, installation and commissioning. Put responsibilities and acceptance requirements in the agreed project schedule.

07 / BUYER QUESTIONS

Perpendicular Beam purchasing questions, answered.

Check the selection, commercial scope and installation requirements before ordering.

Is a transverse beam suitable for every aisle?

Mark the complete load width and side clearances along the travel path first.

How should capacity be interpreted?

Check each pickup point, beam self-weight and the permitted combined load in the final design.

What is the minimum order?

Request a quotation for one crane or a project package; the offer should state the minimum quantity and complete supply scope.

How is lead time confirmed?

Ask for calendar days from deposit and approved drawings to factory dispatch, with freight and site work shown separately.

YOUR NEXT LIFT STARTS HERE

Send the lifting layout. Get a matched perpendicular carrier-beam crane offer.

Share the complete load, arrangement, rail centres, lift, duty, site conditions, destination and required delivery scope. We can return a model-specific drawing, selected specifications and a dated quotation.

Discuss your project
Start with these project details
  • 01 Complete load and attachment
  • 02 Pickup, travel and set-down layout
  • 03 Span, lift and clearances
  • 04 Cycles per hour and operating shifts
  • 05 Runway or foundation information
  • 06 Destination and delivery scope
↑
Perpendicular Carrier-Beam Overhead CraneRequest your project quotation
Get a quotation ↗
Product image gallery
Enlarged product image