Skip to content
Henan mine crane co., ltd. Get a project quote
RUBBER-TIRED / PRECAST YARD

Precast Concrete Straddle Carrier

Carry bridge beams and precast segments from production to curing, storage and trailer loadout.

LOAD
Project rated
HANDLING
Set from the complete suspended mass of the precast beam or segment, lifting beam and rigging.
TRAVEL
Rubber tires
QUOTE
Site matched
Choose a mobile carrier when large concrete elements must move among several yard stations.

Get a configuration and price matched to your load, dimensions, operating cycle and delivery destination.

MINIMUM ORDERConfirm the order scope
CERTIFICATIONDocuments for your destination
LEAD TIMEConfirmed after configuration approval
Red rubber-tired straddle carrier lifting a long concrete component beside an industrial building
Precast component lifting beside a factory
02 / APPLICATIONS

Where the Precast Concrete Straddle Carrier fits.

Choose a mobile carrier when large concrete elements must move among several yard stations.

PRECAST PRODUCTION

Remove cured components

Use the engineer-approved lifting points and concrete strength.

STORAGE YARD

Move to supports or stacks

Check support locations and placement height.

TRAILER LOADOUT

Place long beams for dispatch

Survey trailer position and load overhang.

When to compare a different arrangement

  • Concrete strength or release-lift approval is missing.
  • The attachment does not match the lift-point spacing.
  • Yard pavement is not rated for repeated tire loads.
01 / SPECIFICATIONS

Specifications for the Precast Carrier selection.

The technical offer should state the rated load basis, complete lifting tool, operating envelope, duty and governing site reactions for your order.

Compare the specifications and selection requirements

ParameterReference selection rangeProcurement check
Product / arrangementPrecast Concrete Straddle CarrierConfirm the exact machine and lifting device in the offered drawing.
Rated load for your orderSet from the complete suspended mass of the precast beam or segment, lifting beam and rigging.Include the attachment and rigging in the complete suspended mass.
Clear width / operating envelopeSet from the approved site and load drawingShow the whole route, not only the pickup point.
Lifting height / under-clearanceSet from pickup, travel and placementInclude load depth, spreader or beam and safe clearance.
Duty / handling cycleSelect from lifts, loaded distance and shiftsState typical and maximum loads plus moves per hour.
Complete suspended loadComponent + beam + riggingUse maximum shipping or handling mass.
Clear widthFrom largest component and routeCheck end overhang and turning sweep.
Lifting-point spacingEngineer-approvedSpecify sling angles and load sharing.
Tire reactions / routeCalculated for the final selected machineCheck governing loaded, travel, braking and parked cases.

What the final drawing must show: Rated load · clear width · lift and under-clearance · tire reactions · steering, brakes and controls

EQUIPMENT VIEWS

Review the equipment and configuration views.

Orange rubber-tired straddle carrier beside stacks of rectangular concrete sections in a yard
Straddle carrier beside stored precast sections
Yellow rubber-tired gantry carrier lifting a precast concrete box culvert with multi-leg slings
Box-culvert lifting in a precast yard
03 / CONFIGURATION

Size the Precast Concrete Straddle Carrier for your site.

Send the heaviest load and its lifting points together with a dimensioned route. The quotation should state the selected machine, precast lifting beam and certified anchors, site reactions and acceptance method.

01 / PROJECT INPUT

Load and tool

Provide the precast beam or segment, attachment mass, lifting points and centre of gravity.

02 / PROJECT INPUT

Coverage

Mark mold bay, curing area, storage and dispatch path on a drawing.

03 / PROJECT INPUT

Operating cycle

State loaded moves per hour, shifts, distances and required placement accuracy.

04 / PROJECT INPUT

Site interface

Provide bearing capacity, power, climate, access and destination requirements.

04 / QUOTATION SCOPE

Buy the complete Precast Concrete Straddle Carrier package.

Ask each bidder to quote the same lifting arrangement, site interface, tests and dispatch milestone.

01

Approved machine and site reactions

Request the GA, rated configuration, mold bay, curing area, storage and dispatch path and governing reactions.

02

Named crane, tool and controls

List the precast lifting beam and certified anchors, drives, braking, control and protection as included or excluded.

03

Defined tests and delivery

Set lift-point approval, route and pavement review, loaded travel test, freight, site services and dispatch date in the contract.

05 / ORDERING & DELIVERY

Order with clear documents and delivery milestones.

Align the selected equipment, technical documents, factory dispatch and site responsibilities before placing your order.

MINIMUM ORDER

Confirm the order scope

Request a quotation for one crane or a complete project package; confirm the minimum order for the selected configuration.

CERTIFICATION

Documents for your destination

Agree the documents for the quoted crane and destination: applicable conformity documents, inspection and test records, operating manuals and the approved technical schedule.

LEAD TIME

Confirmed after configuration approval

Agree drawing approval, fabrication, machinery and control integration, factory testing, transport and commissioning milestones for the selected handling system.

Documentation & acceptance

  • Approved general arrangement and installation dimensions
  • Rated-load and operating configuration
  • Support reactions and interface requirements
  • Applicable inspection records and certificates
  • Operating, maintenance and electrical documents
  • Agreed factory and site acceptance procedures

Specify the documents required for your equipment, destination and site approval in the technical offer.

  1. 01

    Configuration & drawing approval

    Agree the load cases, dimensions, operating envelope and supply schedule.

  2. 02

    Manufacture & factory inspection

    Set the inspection scope, acceptance criteria and customer witness points.

  3. 03

    Packing & dispatch

    Confirm transport dimensions, shipping route, packing list and unloading access.

  4. 04

    Installation & handover

    Agree site readiness, commissioning, load testing and operator training.

WARRANTY & AFTER-SALES

Plan support before the equipment arrives.

Request a written warranty schedule identifying the steel structure, drives, controls, power system and lifting attachment, with destination service and wear-part terms.

Request service and warranty terms ↗
TECHNICAL SUPPORT

Installation, maintenance & parts

Include commissioning support, operator training, fault diagnosis and a critical-spares list. Define response arrangements and any on-site technician scope before the order.

SITE RESPONSIBILITIES

Define your handover scope

Identify the equipment and personnel needed for unloading, installation and commissioning. Put responsibilities and acceptance requirements in the agreed project schedule.

07 / BUYER QUESTIONS

Precast Carrier purchasing questions, answered.

Check the selection, commercial scope and installation requirements before ordering.

Can a beam be lifted as soon as it leaves the mold?

Only after its designer approves lifting strength, anchor capacity and the actual pick-point arrangement.

What is the minimum order?

Ask for a quotation for one complete machine. Confirm the commercial minimum and exactly which attachments and services are included.

Which certificates and tests are included?

List the destination-specific compliance documents, factory acceptance test and site load or travel tests in the purchase specification.

How long will delivery take?

Request a dated factory dispatch commitment measured from deposit and approved drawings; show freight, erection and commissioning separately.

YOUR NEXT LIFT STARTS HERE

Send your Precast Concrete Straddle Carrier project brief.

Share your load and mold bay, curing area, storage and dispatch path, operating cycle, site conditions and destination. Ask for a matched GA drawing, reaction schedule, equipment list, tests and dated commercial offer.

Discuss your project
Start with these project details
  • 01 Component mass, dimensions and release strength
  • 02 Approved anchors and pick-point spacing
  • 03 Mold, storage and trailer elevations
  • 04 Loaded route and turn clearances
  • 05 Pavement capacity and moves per shift
  • 06 Destination and loading scope
↑
Precast Concrete Straddle CarrierRequest your project quotation
Get a quotation ↗
Product image gallery
Enlarged product image