Container Gantry Crane for Dongfanghong International Inland Port
A customized rail-mounted gantry crane supports container and mixed-cargo transfer with anti-sway and interchangeable lifting gear.

The project and its handling task.
Henan Mine Crane delivered a rail-mounted container gantry crane to YTO’s Dongfanghong International Inland Port in Luoyang. The project connects inland cargo transfer with the developing logistics hub.
The crane uses variable-frequency drives, Siemens PLC and anti-sway. A ring-type trolley and upper/lower-frame spreader arrangement allow lifting gear interchange for different cargo and handling positions.
Use one terminal lane for containers and other scheduled cargo.
An inland port must move containers precisely while accommodating other freight with different lifting attachments.
Separate container jobs from loads needing another attachment.
Coordinate trolley and gantry travel with vehicle routes.
Verify the attachment, load path and set-down before the next task.
Verify the attachment, load path and set-down before the next task.

The equipment behind this project.
The crane uses variable-frequency drives, Siemens PLC and anti-sway. A ring-type trolley and upper/lower-frame spreader arrangement allow lifting gear interchange for different cargo and handling positions.
- LocationDongfanghong International Inland Port, Luoyang
- Crane typeRail-mounted container gantry
- MotionVariable-frequency drives
- ControlSiemens PLC and anti-sway
- AttachmentRing-type trolley and interchangeable spreader arrangement
What to compare with your own project.
Match the project configuration to your load, layout and operating sequence before selecting a crane package.
| Design area | This project configuration | Define for your site |
|---|---|---|
| Location | Dongfanghong International Inland Port, Luoyang | Container and mixed-cargo schedule. Define the required operating envelope and acceptance checks in your technical brief. |
| Crane type | Rail-mounted container gantry | Rail gauge and lane layout. Define the required operating envelope and acceptance checks in your technical brief. |
| Motion | Variable-frequency drives | Attachment weights and interfaces. Define the required operating envelope and acceptance checks in your technical brief. |
| Control | Siemens PLC and anti-sway | Traffic, positioning and recovery rules. Define the required operating envelope and acceptance checks in your technical brief. |
| Attachment | Ring-type trolley and interchangeable spreader arrangement | Container and mixed-cargo schedule. Define the required operating envelope and acceptance checks in your technical brief. |
See the equipment and working environment.
Explore the equipment arrangement and handling environment.




Delivered.
The crane was delivered to the inland port for its cargo-handling operations. Its motion and lifting-gear arrangement supports the terminal’s container and mixed-cargo requirements.
For a similar project, configure the rail-mounted gantry around truck and rail transfer lanes. Use variable-frequency travel, PLC control and anti-sway for container positioning; define interchangeable lifting gear and a verified changeover routine for other cargo.
Prepare a comparable crane quotation.
Share the load schedule and site drawings. Configure the rail-mounted gantry around truck and rail transfer lanes. Use variable-frequency travel, PLC control and anti-sway for container positioning; define interchangeable lifting gear and a verified changeover routine for other cargo.
We can quote a single crane or a coordinated fleet. The offer sets out the destination standards, required certificates and inspection records, manufacturing programme after drawing approval, shipment, installation support and agreed acceptance scope.
- Container and mixed-cargo schedule
- Rail gauge and lane layout
- Attachment weights and interfaces
- Traffic, positioning and recovery rules
- Destination standards, quantity and inspection documentation
- Manufacturing programme, shipment, commissioning, training and spares
Questions before specifying a similar crane.
Can the same project crane be supplied for my site?
We customize the capacity, span, lifting height, attachment and controls to the load, building or yard layout and operating cycle. Container and mixed-cargo schedule is one of the inputs to review before final equipment selection.
How are certification, quantity and lead time agreed?
Single-crane and fleet enquiries are welcome. Define the destination and required standards in the enquiry. The project offer confirms certification and inspection documents, the quantity, drawing approval and manufacturing schedule, with the shipping and site-service boundaries.
What should acceptance and after-sales support include?
Agree the inspection plan, representative load and functional tests, operator training, maintenance instructions, spare-parts scope and fault-recovery procedures. For this application, include traffic, positioning and recovery rules in the technical review.
Planning a similar lifting project?
Send your layout, load and operating requirements. We can develop a customized crane package and delivery scope for your site.


