Controls and components selected for the operating environment

Variable-frequency speed control and PLC systems support controlled lifting and travel. The equipment proposal also considers dust exposure, corrosion protection and component durability for the project conditions.

The 350 MW figure describes the generating units. Each crane must be selected separately for its own load, lift height, span and operating duty.

Prepare the powerhouse handling schedule

Send equipment weights, installation and maintenance lift requirements, workshop drawings and the site environment. Define the power supply, access for servicing and required acceptance documents so the lifting package can be aligned with the plant programme.

Photographs from this update