| Location | Yancheng Port intelligent warehouse workshop |
| Equipment package | 108 cranes and equipment sets |
| Provision | Intelligent-system upgrade interfaces |
| Planned functions | Monitoring, fault warnings and scheduling |
Prepare the equipment for staged digital integration
The cranes reserve upgrade interfaces for functions including remote monitoring, fault warnings and intelligent scheduling. This approach allows equipment supply and the warehouse’s automation programme to be coordinated in stages.
The package supports a wider unmanned-factory redevelopment plan. The functions commissioned at each stage need to be agreed with the warehouse team and its control-system partners.
Define the material flow before configuring the system
For a comparable warehouse programme, identify the materials, individual load dimensions and weights, storage positions and transfer stations. Include handling frequency and any restrictions on the load interface.
Specify how tasks are issued, how a completed movement is confirmed and how operators handle interruptions. Monitoring, scheduling and autonomous handling have different integration requirements within the warehouse system.
Coordinate commissioning across the equipment package
A multi-crane programme needs acceptance demonstrations for individual machines and for the agreed shared workflows. Include communications, operating zones and the required interaction with other warehouse equipment.
Send the warehouse layout and intended material flow with the enquiry so the crane package and upgrade interfaces can be defined together.

