Equipment prepared for international transport
The dispatch convoy left the manufacturing site with crane equipment for the Vietnamese programme. The order continued the company’s overseas supply activity alongside its domestic projects.
Vietnam is one of Henan Mine’s established export destinations within Southeast Asia.
Coordinate transport and site preparation
For an export order, equipment packing and transport need to be matched with the receiving site’s unloading and assembly plan. Confirm access, supporting-structure readiness, power supply and erection resources before arrival.
Include local inspection and commissioning requirements in the technical order. These inputs help coordinate the crane delivery with the customer’s installation schedule.