| Application | Carbon-block handling at a Shandong baking plant |
| Bridge arrangement | Double girder, single trolley |
| Attachments | Two guided gripping assemblies |
| Operating modes | Independent or coordinated attachment operation |
Two guided attachments handle the stacking sequence
The crane has a box-section double-girder bridge and a single trolley carrying two attachments. The attachments can work independently or together, with pressure control maintaining the specified gripping force.
Rigid guide columns, multiple guide wheels and wear-resistant guide rails support attachment movement. The arrangement addresses block alignment and controlled placement during the baking-plant handling sequence.
Drives and electrical protection suit the operating area
Variable-frequency drives control hoisting and travel, with three-in-one drive units, operating alarms and limit protection. Industrial recirculating air conditioning serves the electrical room in the high-temperature, dusty environment.
Emergency control circuits and safety monitoring form part of the supplied arrangement. Access for inspections and maintenance should be considered alongside the handling layout.
Define block handling before specifying a new crane
Provide block weights, dimensions, pickup patterns, stacking positions and process temperatures. Include the required grip contact areas and any limits on surface damage.
The enquiry should also describe production timing, dust conditions and interfaces with the feeding or storage process. These details establish attachment geometry and the acceptance sequence for a customised stacking system.























