Dispatch date8 November 2021
CustomerJiangsu Shengang
Capacity arrangement400/100 t
PackageSix cranes and equipment sets

Heavy lifting supports pressure-vessel production

The 400 t lifting arrangement serves pressure-vessel manufacture for nuclear-power applications. The project addresses heavy components within the customer’s production process.

The 400/100 t designation identifies the crane’s main and auxiliary lifting arrangement. Permissible operating combinations need to follow its approved technical schedule.

Dispatch forms one stage of the equipment programme

Company personnel joined the factory dispatch event at the intelligent industrial park. The six-crane package serves the Jiangsu manufacturing base.

Transport, site assembly and commissioning follow the factory release stage and require coordination with the customer’s building and production programme.

Describe the component-handling sequence

Provide vessel and component weights, dimensions, lifting points and assembly positions. Include hook spacing, lifting height, workshop clearances and the required duty.

The offer should identify the supplied load-handling arrangement and acceptance demonstrations. Application in pressure-vessel manufacture needs the project’s agreed requirements and documentation.