Spoil load and container size
Bridge Caisson Spoil Removal Gantry
A large bridge caisson needs continuous spoil removal from confined cells without blocking the excavation equipment or surface logistics.

Start with the load and the process route.
A large bridge caisson needs continuous spoil removal from confined cells without blocking the excavation equipment or surface logistics.
The load, lifting attachment, building interface and operating sequence need to be reviewed together.
Prepare the technical brief ↗Caisson cell geometry
Temporary rail/support design
Robot-to-crane sequencing
Coordinate gantry lifting with automated caisson excavation.
Place gantries over the caisson work zone and define how each spoil container is presented by the excavation system, lifted and discharged. Coordinate crane tasks with the automated cutter-suction equipment and caisson sinking sequence.

Collect from the cell
Confirm container or grab interface at the excavation point.
Lift clear of the caisson
Keep the vertical path separated from personnel and equipment.
Discharge at surface
Route spoil to a vehicle or stockpile without interrupting the next excavation cycle.
Robot interface
Define signals and exclusion zones between gantry and excavation equipment.
Temporary works
Check gantry rails and support changes as the caisson sinks.
Changtai Yangtze River Bridge caisson
Multiple gantries supported the Changtai bridge project alongside intelligent cutter-suction equipment for single-cell steel-caisson spoil removal.




Define the operating brief before fixing a crane model.
Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.
| Input | Information needed for this application | Confirm in the technical offer |
|---|---|---|
| 01 / Site requirement | Spoil load and container size | Rated load including the attachment, lifting-point arrangement and load cases. |
| 02 / Site requirement | Caisson cell geometry | Crane span, lifting height, headroom, wheel loads and runway or foundation interfaces. |
| 03 / Site requirement | Temporary rail/support design | Duty classification, speeds and control behaviour matched to the agreed operating cycle. |
| 04 / Site requirement | Robot-to-crane sequencing | Protection, positioning, interlocks, monitoring and safe recovery requirements. |
| Destination and delivery | Country, project standards, quantity, freight and site services. | Documents, inspection and testing, packing, installation support and agreed delivery milestones. |
Send the available load schedule and drawings. The missing inputs can be identified during technical review.
Discuss your project ↗Compare the complete lifting package.
The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.
Engineering
General arrangement, load basis, runway and utility interfaces, control and protection schedule.
Manufacture & inspection
Approved drawings, inspection plan and factory testing for the selected configuration.
Shipping & site work
Packing, freight, erection support, commissioning and operator training as specified.
Handover
Test records, manuals, maintenance instructions and agreed spare-parts list.
Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.
Compare equipment for this operating task.
These product families and related applications provide a starting point. Final selection follows the load and site review.
Before you request a quotation.
What information is needed to specify this crane solution?
Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.
Can the crane system be configured for our site and process?
Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.
What are the order quantity, certification and lead time?
We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.
Send your project brief. Get a crane proposal built around your process.
Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.
Send your project requirements ↗

























