Collect from the cell
Confirm container or grab interface at the excavation point.
A large bridge caisson needs continuous spoil removal from confined cells without blocking the excavation equipment or surface logistics.
Henan Mine Crane equipment for Changtai Yangtze River Bridge caisson
A large bridge caisson needs continuous spoil removal from confined cells without blocking the excavation equipment or surface logistics.
Place gantries over the caisson work zone and define how each spoil container is presented by the excavation system, lifted and discharged. Coordinate crane tasks with the automated cutter-suction equipment and caisson sinking sequence.
Follow the load through the operation to see where lifting equipment, tooling and controls must work together.
Confirm container or grab interface at the excavation point.
Keep the vertical path separated from personnel and equipment.
Route spoil to a vehicle or stockpile without interrupting the next excavation cycle.
These choices affect safety, process fit and the operating life of the installation.
Define signals and exclusion zones between gantry and excavation equipment.
Check gantry rails and support changes as the caisson sinks.
See how cranes and lifting systems were configured for demanding operating environments.

Multiple gantries supported the Changtai bridge project alongside intelligent cutter-suction equipment for single-cell steel-caisson spoil removal.
These product families support the handling tasks above. The final crane and attachment are selected from the site brief.
Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.
Prepare your enquiry ↗Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.
Start a project enquiry ↗