ApplicationOffshore-wind turbine final assembly
Equipment packageSeveral dozen cranes and equipment sets
Lifting arrangementWinch-based, high-lift configuration
FunctionsHook synchronisation, anti-sway and digital/video monitoring

Configure the crane around the assembly task

The lifting equipment combines winch-based design with automatically adjusted fast and slow movement modes. Multiple hooks can operate with high-precision synchronisation for the specified component-handling sequence.

Electronic anti-sway functions support controlled movement. The permitted speeds and coordinated operating modes need to follow the load and attachment configuration.

Monitoring connects the machine with the working area

Digital and video-monitoring functions provide information about equipment operation and the handling environment. These functions form part of the installed protection and management arrangement.

For a new assembly project, define the required displays, alarms and operator controls alongside the mechanical lifting requirements.

Prepare a wind-component handling specification

Send component weights, dimensions, lifting-point drawings and the assembly sequence. Include the required lift height, hook spacing, travel clearances and expected operating cycles.

Acceptance demonstrations should reproduce the agreed transfer and placement tasks, including coordinated hook operation where required. The proposal can then be assessed against the final-assembly process.