| Dispatch date | 13 June 2025 |
| Equipment | Two gantry cranes |
| Rated capacity | 1,000 t per crane |
| Application | Wharf construction on the Yangtze River |
| Tasks | Large machinery and heavy structural-component handling |
High-capacity lifting for a wharf project
Each crane has a rated capacity of 1,000 t. The project configuration combines a high-strength steel structure with an intelligent control system for the required heavy-load handling tasks.
The two-crane supply addresses large-equipment loading and unloading and heavy-component transfer. Any operation involving both cranes needs its own approved load distribution and coordination plan.
Plan the load geometry and construction sequence
For a comparable heavy-lifting project, supply component weights, dimensions, centres of gravity and lifting points. Include the travel path, assembly locations, required lift heights and the sequence in which the structures will be handled.
The site arrangement must be reviewed with the crane supporting structure, access for erection and the working envelope. Rated capacity alone does not define whether the machine can reach the required load positions.
Dispatch and site work require one coordinated programme
The June milestone marks dispatch from the factory. Transport, unloading, erection and commissioning follow within the construction schedule.
Specify the inspection and acceptance stages, technical documents and installation responsibilities with the order. This allows the heavy equipment to be integrated into the wharf-construction programme.