EquipmentTwo automated coke-pot cranes
MilestoneEntered service in late 2024
ApplicationCoking production
FunctionsVariable-frequency movement, video supervision and anti-sway

Controls follow the coke-pot transfer sequence

The cranes use an all-variable-frequency speed-control arrangement for positioning and movement. Centralised electrical controls are combined with mechanical anti-sway assistance for the pot-handling task.

Automation, remote video monitoring and operator interaction form part of the supplied system. The equipment was developed around the customer’s coking-process requirements.

Define the hot-load and attachment interfaces

For a comparable enquiry, provide the coke pot’s loaded weight, geometry and lifting interface, together with the pickup and receiving positions. Include heat exposure and the required working cycle.

The mechanical arrangement and control sequence must be reviewed together. Identify how attachment engagement, transfer and release are confirmed, and how operators manage an interrupted cycle.

Acceptance should demonstrate the process task

Agree the movements, positioning checks and protective responses to be demonstrated before operation. Include video visibility and the required operator controls within that scope.

Send the pot drawings and process layout so the crane configuration can be assessed against the complete transfer task.

Photographs from this update