Control and installation matched to the workshop
The equipment uses variable-frequency control to support controlled load movement. Modular design and aviation-style electrical connectors simplify connections during installation.
The project combines lifting equipment with the handling needs of wind-energy manufacturing, where large components must move through production and assembly areas.
Match the crane to component dimensions
When planning turbine-assembly lifting, provide component mass, dimensions, lifting points and the workshop layout. Specify lifting height, handling speed and control needs for each production stage.