Rated capacity280 t
ConfigurationFour-girder casting crane
Entered service2011
2025 operating historyFourteen years

A long-serving crane for hot and heavy lifting

The four-girder crane was configured for the steelworks’ high-temperature, heavy-load operation. Its 280 t rated capacity is part of the specific installation’s design, together with the load interface and working geometry.

Customer feedback described continued stable operation after fourteen years. The installation offers a long-term operating example for reviewing equipment condition, maintenance access and the service programme at a steel plant.

Structure, drives and protective functions

The equipment uses high-strength steel with material inspection, and finite-element analysis supported optimisation of the four-girder structure. Structural design and manufacturing checks address the loads imposed by the specified operation.

PLC control and variable-frequency drives coordinate the mechanisms. The protective arrangement includes overload protection, limits and emergency braking.

Specify the complete casting-crane duty

For a new ladle-handling crane, provide the loaded ladle weight, lifting interfaces, travel geometry and operating cycle. Include the heat environment and the plant’s inspection and maintenance requirements.

Review the crane configuration, protective functions and acceptance programme as one project-specific arrangement. The quotation should identify the supplied equipment and the demonstrations required before release and commissioning.

Support the equipment throughout service

Long-term operation requires an agreed inspection and maintenance programme for the installed machine. Include access, service responsibilities and the documentation needed by the plant team within the purchase scope.