Rated capacity500 t
ArrangementDual-trolley new-design overhead crane
MilestoneInstalled and operating, January 2024
First-phase programmeForty-three cranes and equipment sets

Coordinated lifting for heavy wind components

The crane uses a high-lift, lightweight hoisting arrangement with automatic fast and slow speed adjustment. Multiple hooks provide high-precision synchronisation for the specified heavy-component task.

Electronic anti-sway functions support controlled movement. Load distribution and hook operation need to follow the approved handling sequence for each component.

Digital and video monitoring

Monitoring and protective functions provide equipment and working-area information. The system connects the crane’s operating condition with the team responsible for use and maintenance.

A new order should state the required displays, alarms, operating modes and information interfaces.

Define the assembly task and acceptance sequence

Send component weights, dimensions, lifting points and the required transfer or assembly steps. Include hook spacing, lifting height, building clearances and the expected duty cycle.

Acceptance should demonstrate the agreed coordinated movements and operator responses. The proposal can then be assessed against the offshore-wind manufacturing process.