Skip to content
Henan mine crane co., ltd. Get a project quote
MGC / Muck-bin lifting, transfer and tipping

MGC Tunnel-Muck Handling Gantry Crane

MGC connects deep tunnel-shaft lifting, muck-bin transfer and controlled discharge. Match the bin and hydraulic tipping interface to the complete suspended load, actual depth and receiving area. Specify any rotation, travel restraint and variable-span provisions for the selected construction process.

Handling
Muck-bin lifting, transfer and tipping
Typical load
45–50 t; project-specific selection
Deep-lift capability
Up to 100 m in selected arrangements
MGC tunnel-muck gantry crane above a construction shaft
Tunnel-muck gantry above a construction shaft — manufacturer photograph.Equipment application photograph
01 / APPLICATIONS

Where the MGC
fits the work.

01

Shaft muck lifting

Raise a loaded muck bin from the defined pickup depth to transfer level. Include bin self-weight, carried material and lifting equipment in the complete suspended mass.

02

Transfer and tipping

Move the bin to the receiving location and discharge through the selected tipping arrangement. Show the receiving vehicle or hopper position and the full bin movement envelope.

03

Specified segment handling

Where segment handling is required, define the segment load and attachment separately from muck-bin work. The useful crane envelope and permitted operating modes must cover that task.

02 / TECHNICAL SPECIFICATIONS

MGC specifications
and equipment configuration.

Compare the lifting mechanism, control functions and site interfaces for the selected crane.

MGC technical specifications and configuration
ModelMGCApplication focusTunnel muck lifting, tipping and segment handling
Typical lifting capacityTypically 45–50 t; selected for the project and complete suspended loadLifting-height capabilityUp to 100 m in project-specific arrangements; confirm with the selected load
Working dutyGenerally heavy-duty; exact working class selected for the cycleTipping systemDedicated spreader / tipping-hook arrangement with hydraulic tipping mechanism
Protection functionsOverload protection, travel limits, buffers and wind protectionKey transmission componentsForged wheels, crowned gear couplings and rolled steel-plate drums
SpanSelected for the shaft, discharge positions and site rail layoutVariable-span provisionVariable-span construction arrangement available where specified
Trolley rotation180° rotating trolley arrangement available for the discharge directionLong-travel arrangementEight-wheel, four-drive arrangement specified with the selected crane
Wind restraintRail clamps and ground-anchor arrangement coordinated with the siteMuck-bin interfaceBin, lifting beam and tipping hooks selected as a matched system
Deep-lift rope systemHook travel, rope arrangement and hoisting package specified for the shaft depthDischarge positionTipping envelope and discharge clearance shown in the layout
Segment handlingSegment load and lifting attachment specified where this duty is requiredOperating controlsLifting, transfer, rotation and tipping functions defined for the selected equipment
Power and cablesSite supply and crane / trolley cable routes specified for the working areaRunway reactionsWheel loads, horizontal reactions and anchoring interfaces supplied for the selected arrangement

Capacity, span, lifting height and duty are selected together. The agreed equipment schedule and drawing define your crane configuration.

03 / EQUIPMENT VIEWS

See the MGC arrangement.

Review the original equipment views alongside the selected crane drawing.

MGC complete gantry arrangement, view 1
MGC gantry arrangement — manufacturer rendering, view 1.
MGC complete gantry arrangement, view 2
MGC gantry arrangement — manufacturer rendering, view 2.
MGC tunnel-muck gantry crane above a construction shaft
Tunnel-muck gantry above a construction shaft — manufacturer photograph.
04 / CONFIGURATION

Choose the MGC equipment and site interfaces.

01 / OPTION

Deep lift and complete load

Select rope arrangement, hook travel, speed and duty for the complete bin, material and lifting equipment. The described 45–50 t capacity and lifting height up to 100 m do not establish every load/depth combination; confirm one matched package.

02 / OPTION

Bin interface and discharge

Supply bin dimensions, self-weight, payload and lifting points. Select spreader or tipping hooks with the hydraulic tipping mechanism and permitted sequence. Check shaft pickup, transfer level, discharge opening and surrounding clearance.

03 / OPTION

Rotation and changing sites

Specify the 180° rotating trolley where required and check the complete tipping/rotation envelope. Variable-span provisions need explicit permitted spans, locations, change procedure, documentation and site responsibilities.

04 / OPTION

Travel and site restraint

Confirm the selected eight-wheel, four-drive arrangement, travel speeds, stops and support reactions. Coordinate rail spacing, foundations, power, rail clamps, ground anchors, parking and operating or storm wind conditions with the construction runway.

05 / PURCHASING & DELIVERY

Confirm the complete MGC supply scope.

ORDER

Order quantity

Request one complete crane or a project package. Send the shaft depth, bin and load information, span, lifting height and destination; mark any values still estimated.

QUOTATION

Equipment and quotation scope

Compare the hoisting, tipping and rotation equipment, controls, travel arrangement and restraints. Identify the bin, rails, power feed, freight and installation services included or excluded.

DOCUMENTS

Drawings and equipment documents

Agree the general arrangement, bin-interface information, load and rope-system schedule, electrical documents and operating instructions for lifting, transfer and tipping.

ACCEPTANCE

Standards and acceptance

State applicable destination standards and required records. Define factory functional checks and load testing for the selected modes, including any agreed rotation or tipping demonstrations and third-party inspection.

DELIVERY

Delivery and installation

Confirm production and shipping timing against the selected equipment and site access. Allocate foundation and rail work, anchors, assembly, commissioning and operator instruction responsibilities.

SUPPORT

Warranty and spare parts

Record warranty terms, starting point, service arrangements and spare parts for the crane and tipping system. If span changes are included, agree the relevant support and documentation scope.

CONTINUE YOUR COMPARISON

Compare related
gantry arrangements.

All 16 double-girder gantry models ↗
07 / QUESTIONS BEFORE ORDERING

Choose the MGC
with the job in view.

Compare the handling task, selected lifting equipment and supply scope before ordering.

Can I order 50 t at 100 m simply from the headline figures?

The typical 45–50 t capacity and up-to-100 m lifting-height statements require a project-specific selection. The actual load, lift, mechanism, duty and arrangement must be confirmed together in the offer.

What does the suspended load include?

Include the bin, carried muck, spreader or tipping hooks and connecting equipment. For any segment-handling mode, state the segment and its attachment separately so its load case is clear.

Is the lifting height the same as shaft depth?

Provide both the pickup level and transfer or placement level, along with the required hook travel and attachment dimensions. The selected layout must cover the complete lifting path and clearance above the shaft.

When is trolley rotation useful?

A rotating arrangement can align the bin with the specified discharge direction. State the receiving position and compare the required rotation envelope with the bin, load and nearby structures before selecting the feature.

Can MGC change span between sites?

Variable-span construction arrangements can be specified. Identify the required rail spacings and locations so the offer can state permitted configurations, the change procedure and the work and support included.

Are ground anchors part of the foundation scope?

Agree the supply and installation responsibilities. The selected restraint system and its interfaces must be coordinated with the site support and parking arrangement, using the relevant loads and wind conditions.

Can it also handle tunnel segments?

Segment handling is an application to specify with its own load, attachment and working envelope. The selected proposal should identify that equipment and the permitted operating modes alongside the muck-bin tasks.

What should I send before requesting a price?

Start with complete load, estimated span, required lifting travel and destination. Add a shaft sketch, bin details and discharge position when available. Unknown values can be confirmed while the initial arrangement is developed.

08 / YOUR MGC GANTRY PROJECT

Get a quotation
for your MGC crane.

Tell us what you lift, the approximate span, the required lifting height and your destination. If a dimension is unknown, describe the task and leave that field open.

  • An arrangement matched to the lifting task
  • A clear equipment and service scope
  • Delivery and support terms in the offer

info@cranehenanmine.com

PRODUCT SELECTEDMGC Tunnel-Muck Handling Gantry Crane

Not sure about a dimension? Leave it blank. A site sketch is helpful when available.

MGC gantry craneDiscuss your lifting task
Request a quote ↗
MGC equipment gallery
Enlarged MGC crane image

↑