Skip to content
CRANE MANUFACTURER SINCE 2002
info@hnksglobal.com+86 188 3620 7779Project enquiry ↗
Henan Mine Crane Request a quote
HENAN MINE CRANE / GANTRY CRANES

Slag Removal Gantry Crane

A site crane for raising, transferring and tipping tunnel spoil containers and handling precast segments.

MGCModel designationTypically 45–50 tRated load selection
Henan Mine Crane Slag Removal Gantry Crane (MGC)PRODUCT CONFIGURATION / MGC
THE LIFTING TASK

Designed for your handling path.

A site crane for raising, transferring and tipping tunnel spoil containers and handling precast segments.

01 / APPLICATION

Where it fits

Tunnel and infrastructure works

02 / EQUIPMENT

Crane arrangement

Project gantry with Slag bucket / segment tool.

MODEL MGC

Technical configuration

Size the crane against the load, installation geometry and work cycle. The final equipment schedule follows the project drawings and operating brief.

Rated capacityTypically 45–50 t
Lifting heightUp to 100 m
Duty classHeavy service
Bridge / structureProject gantry
Lifting systemSlag bucket / segment tool
Crane spanSet from the required coverage and rail centers
Control arrangementPendant or radio remote to suit operator visibility
Power supplyMatch voltage and frequency to the destination site
Runway and foundationsCheck rail gauge, wheel loads and foundation design
Hook approach and clearanceConfirm required lifting envelope against the site drawings
BUYER'S SELECTION GUIDE

Specify the crane around the job.

Tunnel and infrastructure works

Compare the Gantry Cranes range ↗
01

Load and lifting attachment

Share the maximum lifted mass, load dimensions, center of gravity and any grab, magnet, spreader or lifting beam.

02

Rails and working envelope

Confirm rail gauge, runway length, foundation capacity, cantilever and end approaches.

03

Duty and controls

State typical load, lifts per hour, travel distance, shifts, control position and site power supply.

04

Model-specific check

Bucket mass; tipping route; lift height

TALK TO OUR ENGINEERS

Get a MGC crane proposal.

Send the load schedule and site drawings. We can configure the crane, lifting system and installation interface for your operating conditions.

Request a technical proposal ↗
  • Maximum lifted load and attachment
  • Span, travel length and available clearances
  • Daily lifting cycle and control choice
  • Power supply, environment and destination