Heavy ladle transfer
Move a compatible ladle between defined process positions using the selected main lifting arrangement. Supply the complete suspended mass, lifting interfaces and required clearances along the route.
Bridge cranes for workshops and production lines.
Explore Overhead Cranes
Ground-supported lifting for yards and construction.
Explore Gantry Cranes
Wire rope and chain hoists for lifting points and cranes.
Explore Electric Hoists

Wire rope lifting and pulling with a powered drum.
Explore Electric Winches
Grab buckets, magnets and hooks for your load.
Explore Lifting Attachments & Grabs
Mobile handling for containers, precast and yard loads.
Explore Rubber-Tired Gantry Cranes & Straddle Carriers

Lift and move vessels through boatyards and marinas.
Explore Marine Travel Lifts
Ladle, slab, scrap and coil handling across steel production.

Container stacking and cargo transfers across terminals and rail.

Turbine installation, powerhouse maintenance and wind equipment assembly.

Controlled component transfer and positioning for precision assembly.

Heavy fabrication, production lifting and factory crane automation.

Process lifting for smelters, carbon blocks and anode materials.

Clean lifting and classified protection for sensitive process areas.

Bridge fabrication, metro construction and ship block assembly.

Automated storage and retrieval for plates, cables and bins.

Follow project dispatches, crane engineering and factory acceptance.

Dispatch, installation and equipment in service

Crane configurations and handling technology

Factory inspections, acceptance and test programmes

Company developments, people and community programmes
Give heavy ladle handling separate main and auxiliary lifting positions on a four-girder casting bridge. YZS uses independently travelling main and auxiliary trolleys, with their loads, spacing and permitted movements selected for the process. Compare nine A7 reference configurations, then coordinate the lifting attachments, hook envelope, runway reactions and safety controls as one engineered system.

Start with the information you already have. A load drawing and workshop sketch help us recommend a configuration.
The main and auxiliary trolleys travel separately on the four-girder bridge. Specify the load at each lifting point, required spacing and travel limits so their working envelopes serve the actual handling sequence.
Nine reference rows retain main/auxiliary loads, span, lift, hoist and travel speeds, wheel load and rail together. Compare a complete row and identify project differences before accepting a crane proposal.
Trolley positions change how loads reach the runway. A dimensioned arrangement and final wheel-reaction schedule let the building team check rails, supporting structure and clearances against the selected crane.

Move a compatible ladle between defined process positions using the selected main lifting arrangement. Supply the complete suspended mass, lifting interfaces and required clearances along the route.
Where the process requires auxiliary assistance, define the second lifting connection and how its trolley must approach the main load. The technical agreement establishes load limits and permitted coordinated movements.
Develop the crane envelope and runway interface alongside the plant layout. Review both trolley travel envelopes, wheel reactions, roof clearance and maintenance access before fixing the building or crane dimensions.
Confirm the full suspended load, ladle interface, permitted simultaneous movements, heat exposure and safety functions for the complete ordered crane.
Compare each load, span, lift and speed as one configuration. The technical agreement gives the selected crane and its permitted operating modes.
| Rated capacity · YZS main / auxiliary configurations | 125/32 / 140/32 / 160/32 / 180/50 / 200/50 / 225/65 / 240/80 / 280/80 / 320/80 t |
|---|---|
| Crane span · reference configurations | 19 / 22 / 24.5 / 27 / 28 / 28.5 m; paired with specific capacities |
| Main lifting height · reference configurations | 22–32 m; confirm the capacity-specific table |
| Duty class · reference configurations | A7 |
| Main hoisting speed · 125/32 / 140/32 / 160/32 t | 7.6 / 7.8 / 9.8 m/min |
| Main hoisting speed · 180/50 / 200/50 / 225/65 / 240/80 t | 7.5 / 6 / 11 / 7 m/min |
| Main hoisting speed · 280/80 / 320/80 t | 12 / 7.5 m/min |
| Catalogue power supply | Three-phase AC 380 V / 50 Hz |
| Structure / lifting system | Four-girder casting bridge with separate main and auxiliary lifting trolleys |
Nine 125/32–320/80 t configurations are listed at A7 duty. Capacity, span, height and speed remain paired by configuration. Larger projects require a separate rated schedule.
The YZS matched configurations table below retains the capacity, span, lifting and travel values from each handbook configuration column.
| Main / aux load (t) | Span (m) | Main / aux lift (m) | Main / aux hoist (m/min) | Main / aux trolley (m/min) | Bridge (m/min) | Max wheel load (kN) | Crane rail | Working class |
|---|---|---|---|---|---|---|---|---|
| 125/32 | 19 | 24 / 26 | 7.6 / 9.7 | 38 / 39 | 76 | 505 | QU120 | A7 |
| 140/32 | 19 | 22 / 24 | 7.8 / 9.7 | 36 / 37.5 | 73 | 535 | QU120 | A7 |
| 160/32 | 27 | 25 / 26 | 9.8 / 12 | 43.5 / 43.5 | 84 | 485 | QU120 | A7 |
| 180/50 | 28.5 | 27 / 29 | 7.5 / 10 | 40 / 38 | 80 | 525 | QU120 | A7 |
| 200/50 | 28 | 26 / 26 | 6 / 10 | 41 / 38 | 78 | 530 | QU120 | A7 |
| 225/65 | 27 | 32 / 34 | 11 / 11 | 41 / 39.5 | 84 | 550 | QU120 | A7 |
| 240/80 | 22 | 25 / 27 | 7 / 9.6 | 35 / 38 | 80 | 545 | QU120 | A7 |
| 280/80 | 22 | 29 / 29 | 12 / 10 | 40 / 40 | 80 | 735 | QU120 | A7 |
| 320/80 | 24.5 | 28 / 32 | 7.5 / 10 | 29 / 39 | 58 | 750 | QU120 | A7 |
| Parameter | Reference selection range | Procurement check |
|---|---|---|
| Rated capacity · YZS main / auxiliary configurations | 125/32 / 140/32 / 160/32 / 180/50 / 200/50 / 225/65 / 240/80 / 280/80 / 320/80 t | Confirm the selected configuration in the approved technical offer. |
| Crane span · reference configurations | 19 / 22 / 24.5 / 27 / 28 / 28.5 m; paired with specific capacities | Use the value paired with the chosen capacity. |
| Main lifting height · reference configurations | 22–32 m; confirm the capacity-specific table | Use the value paired with the chosen capacity. |
| Duty class · reference configurations | A7 | Confirm the selected configuration in the approved technical offer. |
| Main hoisting speed · 125/32 / 140/32 / 160/32 t | 7.6 / 7.8 / 9.8 m/min | Use the value paired with the chosen capacity. |
| Main hoisting speed · 180/50 / 200/50 / 225/65 / 240/80 t | 7.5 / 6 / 11 / 7 m/min | Use the value paired with the chosen capacity. |
| Main hoisting speed · 280/80 / 320/80 t | 12 / 7.5 m/min | Use the value paired with the chosen capacity. |
| Catalogue power supply | Three-phase AC 380 V / 50 Hz | Confirm the selected configuration in the approved technical offer. |
| Structure / lifting system | Four-girder casting bridge with separate main and auxiliary lifting trolleys | Confirm the selected configuration in the approved technical offer. |
Use the equipment views to discuss bridge geometry and the two lifting positions. The ordered drawing must show the main and auxiliary trolley travel, minimum and required spacing, hook approaches, lifting-device envelope and clearances to the building. The final load schedule identifies the permitted operating cases and runway reactions.


Keep every value in the matched YZS table attached to its original capacity pair. The nine A7 rows are reference configurations; any revised span, lift, speed, load or trolley arrangement needs a confirmed project schedule and runway-load assessment.

List the load handled by each trolley, including the ladle, carrier, rigging and other suspended equipment. Define whether the functions operate separately or in an agreed coordinated sequence; their ratings do not create an additive or tandem capacity.
Provide ladle pickup dimensions, attachment drawings, connection spacing and centre-of-gravity information through the specified movement. Identify which lifting devices are supplied and how they connect to each hoisting function.
Show the required distance between lifting points, each trolley's travel limits, hook approaches and main/auxiliary lifting heights. Check station obstructions and maintenance clearances against the complete four-girder arrangement.
Specify permitted simultaneous movements, travel restrictions and the required response to faults or power loss. The technical agreement defines braking, limits, overload functions, monitoring and interlocks for the selected process.
The listed references use A7 duty and 380 V / 50 Hz / three-phase power. State the actual load spectrum, cycles, ambient and radiant heat, supply and positioning needs so the offer identifies thermal protection and selected motion speeds.
Request the final maximum wheel-reaction schedule for the specified trolley positions and operating cases. Coordinate runway rails, supporting steel, power feed, access and erection space; confirm the installation and commissioning responsibilities in the supply scope.
Compare YZS offers against one approved load schedule, four-girder arrangement and operating sequence. Identify the two trolleys, lifting devices, protection and controls alongside the engineering, inspection, delivery and commissioning services included in the purchase.
Identify the bridge, lifting mechanisms, lifting attachment, heat protection, controls and power feed. State the selected operating modes and equipment boundaries in the offer.
Request the arrangement, lifting-interface drawing, load-and-motion schedule, electrical information, safety-function description and agreed factory/site checks for the ordered crane.
List rails, runway steelwork, attachments, automation, weighing, spares, packing, freight, erection and commissioning as included, optional or excluded.
Agree drawing approval, manufacturing, testing and dispatch milestones for the selected configuration. Include access, shutdown windows and the destination in the delivery plan.
Define erection supervision, power and runway preparation, protection checks, attachment fit, trial operation and operator training, with responsibilities agreed before site work.
Record the warranty terms and commencement, service arrangements and recommended brake, rope, drive, control and attachment spares for the equipment supplied.
Agree load, lifting device, route, duty, thermal conditions and operating modes.
Coordinate hook coverage, attachment fit, runway reactions and site responsibilities.
Complete the agreed checks and records, then coordinate packing and shipment.
Confirm erection, commissioning, operator training and service arrangements.
Technical schedule · General arrangement · Attachment interface · Runway loads · Electrical information · Safety-function description · Agreed inspection records · Operation and maintenance manuals
Review the lifting task, configuration and quotation scope. We can help develop a crane proposal from the project information available.
Consider YZS where the process needs a four-girder casting bridge with separate main and auxiliary trolleys. Compare each lifting task, required trolley separation and travel, hook envelope, load distribution and building interface. The handling sequence determines whether this arrangement offers the right fit.
The YZS arrangement has four girders and separate main and auxiliary lifting trolleys. YZ is the double-girder casting arrangement with a gantry-type ladle carrier and auxiliary hook on its selected trolley layout. Compare complete systems using the ladle interfaces, required movements and runway reactions, rather than capacity alone.
No. It identifies separate 320 t main and 80 t auxiliary ratings. It does not authorize a 400 t combined lift. Any shared-load or coordinated operation requires an explicitly defined load case, load-sharing basis and approved operating arrangement in the technical agreement.
The permitted simultaneous movements must be defined for the selected crane and process. State the load on each trolley, their positions and intended sequence. The technical offer then identifies operating limits, controls and interlocks; separate trolley travel does not establish unrestricted coordinated use.
The table lists nine main/auxiliary pairs: 125/32, 140/32, 160/32, 180/50, 200/50, 225/65, 240/80, 280/80 and 320/80 t. Each row has its own span, lifts, speeds and wheel load. Keep these values paired rather than combining a load from one row with the dimensions of another.
A different load, span or lifting arrangement needs an individually confirmed technical schedule. Supply the complete suspended loads, station layout, trolley requirements and building information. The project proposal establishes the rated configuration and runway loads; the table does not define a universal capacity ceiling or unrestricted option range.
Load distribution changes as the main and auxiliary trolleys move. The maximum runway reaction may occur in an operating position different from the normal pickup point. Request the ordered crane's wheel-reaction schedule and load cases so the building team can check the rails and supporting structure against the actual arrangement.
Provide empty and filled ladle weights, each carrier or lifting-device weight, pickup dimensions, connection spacing and centre-of-gravity information. Include the handling sequence and required lifting-point spacing. These inputs establish the loads, interfaces and usable hook envelope for both trolleys.
No. A7 is the listed reference duty, while the complete operating cycle, load spectrum, thermal exposure, lifting devices and safety functions still need to be specified. The technical agreement defines the crane's intended molten-metal service, protective equipment and acceptance basis for that project.
Request the four-girder layout, both trolley and lifting-device scopes, rated operating cases, wheel reactions, thermal and safety package, controls, tests and destination documents. The offer should also identify production and delivery milestones, installation and commissioning responsibilities, training, warranty terms and spares. Submit a one-unit or project-batch enquiry and have the written offer confirm the commercial scope.
Send the complete ladle load, the task for each trolley and a sketch of the process stations. Add the ladle or lifting-device drawing and runway span if available so we can develop a matched four-girder arrangement.
info@cranehenanmine.com