Rig the component
Set lifting points and center of gravity for the current assembly stage.
Large offshore wind components can require several pickup points, high lift and slow final positioning during assembly.
Henan Mine Crane equipment for Offshore wind assembly base
Large offshore wind components can require several pickup points, high lift and slow final positioning during assembly.
Specify the workshop crane fleet around component geometry and sequence. Synchronize multiple hooks, apply controlled speed and anti-sway, and monitor the lift path visually and digitally before each assembly hand-off.
Follow the load through the operation to see where lifting equipment, tooling and controls must work together.
Set lifting points and center of gravity for the current assembly stage.
Keep hooks synchronized during high lift and cross-travel.
Use low-speed positioning at the fixture and confirm a stable support before unhooking.
These choices affect safety, process fit and the operating life of the installation.
Check hook load balance throughout travel and rotation of the component.
Plan monitoring and service access around the production schedule.
See how cranes and lifting systems were configured for demanding operating environments.

Dozens of cranes supported an offshore wind-turbine assembly base, with high lift, synchronized hooks, electrical anti-sway and digital and visual monitoring.
These product families support the handling tasks above. The final crane and attachment are selected from the site brief.
Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.
Prepare your enquiry ↗Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.
Start a project enquiry ↗