Rig the assembly
Determine lifting lugs, center of gravity and support method for each vessel.
Large chemical-process equipment can require high-capacity outdoor handling, long travel and careful positioning at welding or assembly stations.
Henan Mine Crane equipment for Shandong chemical-equipment manufacturer
Large chemical-process equipment can require high-capacity outdoor handling, long travel and careful positioning at welding or assembly stations.
Lay out the gantry runway around the largest vessel, fabrication bays and vehicle access. Coordinate PLC and variable-frequency travel, anti-sway and operator monitoring for controlled moves between work areas.
Follow the load through the operation to see where lifting equipment, tooling and controls must work together.
Determine lifting lugs, center of gravity and support method for each vessel.
Check gantry clearance and travel beside fabrication work.
Use controlled low-speed movement at the assembly fixture.
These choices affect safety, process fit and the operating life of the installation.
Check the full swept path, not only the nominal span and capacity.
Provide visible crane status and safety monitoring throughout the lift.
See how cranes and lifting systems were configured for demanding operating environments.

The project involved more than 30 cranes for a Shandong high-end chemical-equipment manufacturer, including a 400 t double-girder gantry with PLC and variable-frequency control.
These product families support the handling tasks above. The final crane and attachment are selected from the site brief.
Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.
Prepare your enquiry ↗Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.