Skip to content
Henan mine crane co., ltd. Get a project quote
CONSTRUCTION CRANE SOLUTIONS

500 t Bridge Tower Assembly Gantry

Large cable-stayed-bridge tower modules need heavy controlled lifts at fabrication and preassembly stations before erection.

ApplicationMa'anshan Yangtze rail-road bridge
Project equipmentBuilt for this handling task
Site-specificLoad, route, duty and delivery scope
Heavy gantry crane lifting a bridge tower construction component
Heavy gantry crane lifting a bridge tower construction component.
THE OPERATING CHALLENGE

Start with the load and the process route.

Large cable-stayed-bridge tower modules need heavy controlled lifts at fabrication and preassembly stations before erection.

The load, lifting attachment, building interface and operating sequence need to be reviewed together.

Prepare the technical brief ↗
01 / DEFINE

Steel section dimensions and mass

02 / DEFINE

Yard/runway plan

03 / DEFINE

Concurrent crane schedule

04 / DEFINE

Trial-assembly tolerances

ENGINEERED FOR THE APPLICATION

Move major steel-tower sections through bridge fabrication and assembly.

Size the gantry fleet from the heaviest tower section and site layout. Coordinate several gantries so fabrication, trial assembly and dispatch can proceed without conflicting load paths.

Heavy gantry crane lifting a bridge tower construction component
Heavy gantry crane lifting a bridge tower construction component.
01

Pick the module

Confirm lifting points and support frames for each steel section.

02

Travel through assembly

Assign gantry paths and waiting zones in the fabrication yard.

03

Set for fit-up

Position sections for trial assembly and inspection before release.

✓

Multiple cranes

Define traffic and lift-plan boundaries for concurrent equipment.

✓

Temporary support

Check bearing and alignment of the segment at every hand-off.

PROJECT IN OPERATION

Ma'anshan Yangtze rail-road bridge

The project involved more than ten gantry cranes, including 500 t and 400 t units, for main steel-tower work; a Z3 tower-section trial assembly passed inspection.

Process fit500 t Bridge Tower Assembly Gantry Solution
EquipmentHook Gantry Crane / New-Design Double-Trolley Gantry Crane
ProjectMa'anshan Yangtze rail-road bridge
Technical reviewCustomer load and site drawings
SPECIFICATION FOR YOUR SITE

Define the operating brief before fixing a crane model.

Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.

InputInformation needed for this applicationConfirm in the technical offer
01 / Site requirementSteel section dimensions and massRated load including the attachment, lifting-point arrangement and load cases.
02 / Site requirementYard/runway planCrane span, lifting height, headroom, wheel loads and runway or foundation interfaces.
03 / Site requirementConcurrent crane scheduleDuty classification, speeds and control behaviour matched to the agreed operating cycle.
04 / Site requirementTrial-assembly tolerancesProtection, positioning, interlocks, monitoring and safe recovery requirements.
Destination and deliveryCountry, project standards, quantity, freight and site services.Documents, inspection and testing, packing, installation support and agreed delivery milestones.
Have a preliminary layout?

Send the available load schedule and drawings. The missing inputs can be identified during technical review.

Discuss your project ↗
FROM OFFER TO HANDOVER

Compare the complete lifting package.

The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.

01

Engineering

General arrangement, load basis, runway and utility interfaces, control and protection schedule.

02

Manufacture & inspection

Approved drawings, inspection plan and factory testing for the selected configuration.

03

Shipping & site work

Packing, freight, erection support, commissioning and operator training as specified.

04

Handover

Test records, manuals, maintenance instructions and agreed spare-parts list.

Order quantity, compliance and delivery schedule

Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.

RELATED CRANES AND SOLUTIONS

Compare equipment for this operating task.

These product families and related applications provide a starting point. Final selection follows the load and site review.

BUYER QUESTIONS

Before you request a quotation.

What information is needed to specify this crane solution?

Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.

Can the crane system be configured for our site and process?

Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.

What are the order quantity, certification and lead time?

We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.

LET'S REVIEW YOUR PROJECT

Send your project brief. Get a crane proposal built around your process.

Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.

Send your project requirements ↗