Move one hoist between aligned track zones
Use an engineered rail-transfer interface when maintenance positions span separate runway sections. Confirm trolley compatibility and positive locking before transfer.
Bridge cranes for workshops and production lines.
Explore Overhead Cranes
Ground-supported lifting for yards and construction.
Explore Gantry Cranes
Wire rope and chain hoists for lifting points and cranes.
Explore Electric Hoists

Wire rope lifting and pulling with a powered drum.
Explore Electric Winches
Grab buckets, magnets and hooks for your load.
Explore Lifting Attachments & Grabs
Mobile handling for containers, precast and yard loads.
Explore Rubber-Tired Gantry Cranes & Straddle Carriers

Lift and move vessels through boatyards and marinas.
Explore Marine Travel Lifts
Ladle, slab, scrap and coil handling across steel production.

Container stacking and cargo transfers across terminals and rail.

Turbine installation, powerhouse maintenance and wind equipment assembly.

Controlled component transfer and positioning for precision assembly.

Heavy fabrication, production lifting and factory crane automation.

Process lifting for smelters, carbon blocks and anode materials.

Clean lifting and classified protection for sensitive process areas.

Bridge fabrication, metro construction and ship block assembly.

Automated storage and retrieval for plates, cables and bins.

Follow project dispatches, crane engineering and factory acceptance.

Dispatch, installation and equipment in service

Crane configurations and handling technology

Factory inspections, acceptance and test programmes

Company developments, people and community programmes
Plan a lifting route between bays where standard bridge travel cannot cross the track boundary. This is a project-engineered rail-transfer concept, not one fixed catalogue rating. Define the transfer mechanism, both track interfaces, locking sequence and load envelope before selecting a KSX or other arrangement.
Get a configuration and price matched to your load, dimensions, operating cycle and delivery destination.

Review the transfer stations, available supports and complete trolley route to establish where the crane can connect adjacent lifting areas.
Use an engineered rail-transfer interface when maintenance positions span separate runway sections. Confirm trolley compatibility and positive locking before transfer.
Map the project-selected bridge positions and the whole hook route from pickup to laydown. Verify support reactions and structural clearances at every transfer position.
Define which track sections can connect, operating limits and the interlock sequence. Provide a recovery method if a bridge cannot align or lock.
Select the final capacity, span, duty and speeds for the actual site. Request a model-specific drawing and technical offer before purchase.
Compare the specifications and selection requirements
| Parameter | Reference selection range | Procurement check |
|---|---|---|
| Rated capacity | Project-defined | Send complete suspended load and load distribution. |
| Span / track geometry | Project-defined | Provide measured rail centres, runway details and clearances. |
| Lift and hook envelope | Project-defined | Mark pickup, travel and set-down elevations. |
| Duty and cycle | Project-defined | State lifts per hour, shifts and typical versus maximum loads. |
| Travel and hoist speeds | Project-defined | Select from positioning requirement and cycle time. |
What the final drawing must show: Rated load · rail-centre span · lift and hook approach · crane dimensions · wheel loads · selected mechanism and controls
For multi-bay maintenance and equipment transfer, show pickup, travel and set-down locations on one drawing. Request hook envelope, reactions and the selected mechanism in the technical offer.
Include payload, rigging and any attachment or carrier beam.
Mark rail centres, lift, approach distances, obstacles and travel length.
State loads per cycle, cycles per hour, shifts and required positioning.
Provide runway or foundation capacity, power and destination requirements.
Require the same load case, approved layout, equipment list and delivery milestone from every supplier.
Request a general arrangement, hook coverage, wheel loads and support interface.
List bridge or portal, hoist or trolley, attachment, drives, brakes, limits and overload protection.
Separate factory inspection, dispatch, freight, installation, site load test and operator documents.
Align the selected equipment, technical documents, factory dispatch and site responsibilities before placing your order.
Request a quotation for one crane or a complete project package; confirm the minimum order for the selected configuration.
Agree the documents for the quoted crane and destination: applicable conformity documents, inspection and test records, operating manuals and the approved technical schedule.
Agree the production schedule after the crane arrangement, runway reactions, selected mechanisms and control specification are approved. State factory dispatch, freight and commissioning dates separately.
Specify the documents required for your equipment, destination and site approval in the technical offer.
Agree the load cases, dimensions, operating envelope and supply schedule.
Set the inspection scope, acceptance criteria and customer witness points.
Confirm transport dimensions, shipping route, packing list and unloading access.
Agree site readiness, commissioning, load testing and operator training.
Confirm the warranty period, start date and coverage for the bridge, selected hoist or trolley, travel drives and controls in the written offer. List wear parts and service responsibilities separately.
Request service and warranty terms ↗Define installation guidance, commissioning support, maintenance documents and model-specific spares. Include any engineer attendance and operator training in the order scope.
Identify the equipment and personnel needed for unloading, installation and commissioning. Put responsibilities and acceptance requirements in the agreed project schedule.
Review related equipment against your load, site geometry and operating cycle.
Check the selection, commercial scope and installation requirements before ordering.
The 12.5 t KSX is one rail-transfer configuration. A multi-bay transfer system is selected around the support layout, trolley route, locking interfaces and complete lifted load.
No. A dedicated transfer structure, aligned tracks and positive interlocks are required.
Request a quotation for one crane or a project package; the offer should state the minimum quantity and complete supply scope.
Ask for calendar days from deposit and approved drawings to factory dispatch, with freight and site work shown separately.
Share the complete load, arrangement, rail centres, lift, duty, site conditions, destination and required delivery scope. We can return a model-specific drawing, selected specifications and a dated quotation.
Discuss your project