Hot-commissioning date18 November 2021
Units in the hot trialTwo
Rated capacity per unit200 t
Wider packageEight four-girder casting cranes

Casting cranes handle ladles for refining

The 200 t machines are intended to lift loaded steel ladles during refining operations. Their controls coordinate movement with the steelmaking process.

Monitoring and sensor functions provide fault detection and operating information within the supplied configuration.

Hot commissioning checks the process-handling arrangement

The two machines participated in the project’s successful hot trial. This stage connects equipment operation with the actual refining process and ladle movements.

The eight-crane package serves the wider project, while the November hot-commissioning update concerns the two 200 t units.

Define ladle and process requirements for an enquiry

Provide ladle weights, maximum suspended loads, temperatures, stations and operating cycles. Include the required hook arrangement and building clearances.

Agree protective functions, inspection stages and the commissioning responsibilities before manufacture. The acceptance sequence should follow the intended refining duty.

Photographs from this update