| Hot-commissioning date | 18 November 2021 |
| Units in the hot trial | Two |
| Rated capacity per unit | 200 t |
| Wider package | Eight four-girder casting cranes |
Casting cranes handle ladles for refining
The 200 t machines are intended to lift loaded steel ladles during refining operations. Their controls coordinate movement with the steelmaking process.
Monitoring and sensor functions provide fault detection and operating information within the supplied configuration.
Hot commissioning checks the process-handling arrangement
The two machines participated in the project’s successful hot trial. This stage connects equipment operation with the actual refining process and ladle movements.
The eight-crane package serves the wider project, while the November hot-commissioning update concerns the two 200 t units.
Define ladle and process requirements for an enquiry
Provide ladle weights, maximum suspended loads, temperatures, stations and operating cycles. Include the required hook arrangement and building clearances.
Agree protective functions, inspection stages and the commissioning responsibilities before manufacture. The acceptance sequence should follow the intended refining duty.