Prepare the test load
Set mass, rigging and target coordinates for the acceptance procedure.
Nuclear-project fabrication requires controlled heavy-load movement and acceptance evidence for precise stopping and holding.
Henan Mine Crane equipment for China nuclear project gantry acceptance
Nuclear-project fabrication requires controlled heavy-load movement and acceptance evidence for precise stopping and holding.
Specify a double-girder gantry around the load route and test points. Servo travel and vector-controlled hoisting support precise movement, while PLC anti-sway, dual brakes and factory load tests verify the required behavior.
Follow the load through the operation to see where lifting equipment, tooling and controls must work together.
Set mass, rigging and target coordinates for the acceptance procedure.
Check servo travel and anti-sway at the specified speeds.
Verify brake behavior and record positioning under load.
These choices affect safety, process fit and the operating life of the installation.
Agree the measurement method for inching and final position before testing.
Define holding and inspection requirements for both hoist brakes.
See how cranes and lifting systems were configured for demanding operating environments.

A 100 t double-girder gantry passed factory acceptance for a China nuclear project. Its test scope included a 0.5 mm minimum inching distance, positioning within 5 mm and dual hoist brakes.
These product families support the handling tasks above. The final crane and attachment are selected from the site brief.
Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.
Prepare your enquiry ↗Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.
Start a project enquiry ↗