Trace ladle movement
Record pickup, refining and set-down points with clearances.
Refining depends on predictable movement of full steel ladles between treatment stations; a missed lift interrupts the process.
Henan Mine Crane equipment for Jinhui Group refining line
Refining depends on predictable movement of full steel ladles between treatment stations; a missed lift interrupts the process.
Plan dedicated four-girder casting cranes for the filled-ladle route. Match controlled speed and monitoring to the furnace and refining positions, then test the installed system against the plant's operating sequence.
Follow the load through the operation to see where lifting equipment, tooling and controls must work together.
Record pickup, refining and set-down points with clearances.
Set travel and hoisting behavior for steady handling at full load.
Test alarm, fault response and movement through hot commissioning.
These choices affect safety, process fit and the operating life of the installation.
Review heat exposure and the safety architecture for the actual ladle duty.
Check runway, power supply and operating interlocks before production handover.
See how cranes and lifting systems were configured for demanding operating environments.

The project included eight heavy four-girder casting cranes. Two 200 t units supported hot commissioning and carried full steel ladles for refining.
These product families support the handling tasks above. The final crane and attachment are selected from the site brief.
Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.
Prepare your enquiry ↗Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.
Start a project enquiry ↗