Shaft excavation
Raise filled spoil containers from the shaft. Include the container, rigging and material in the complete lift, with pickup depth below rail and clear height above it.
Bridge cranes for workshops and production lines.
Explore Overhead Cranes
Ground-supported lifting for yards and construction.
Explore Gantry Cranes
Wire rope and chain hoists for lifting points and cranes.
Explore Electric Hoists

Wire rope lifting and pulling with a powered drum.
Explore Electric Winches
Grab buckets, magnets and hooks for your load.
Explore Lifting Attachments & Grabs
Mobile handling for containers, precast and yard loads.
Explore Rubber-Tired Gantry Cranes & Straddle Carriers

Lift and move vessels through boatyards and marinas.
Explore Marine Travel Lifts
Ladle, slab, scrap and coil handling across steel production.

Container stacking and cargo transfers across terminals and rail.

Turbine installation, powerhouse maintenance and wind equipment assembly.

Controlled component transfer and positioning for precision assembly.

Heavy fabrication, production lifting and factory crane automation.

Process lifting for smelters, carbon blocks and anode materials.

Clean lifting and classified protection for sensitive process areas.

Bridge fabrication, metro construction and ship block assembly.

Automated storage and retrieval for plates, cables and bins.

Follow project dispatches, crane engineering and factory acceptance.

Dispatch, installation and equipment in service

Crane configurations and handling technology

Factory inspections, acceptance and test programmes

Company developments, people and community programmes
Select a subway slag gantry around the filled spoil container, shaft depth and discharge arrangement. The hoist, turning attachment and controls must suit the complete lift and excavation cycle. Compare the selected configuration with the available height above rail, depth below rail and clear discharge space.

Coordinate the crane, spoil container and discharge sequence as one working arrangement for the excavation site.
Raise filled spoil containers from the shaft. Include the container, rigging and material in the complete lift, with pickup depth below rail and clear height above it.
Position the container over the agreed discharge area. Match the lifting attachment, turning sequence and opening to the container, with defined exclusion space around the shaft and suspended load.
Serve planned transfer, truck and temporary storage positions along the runway. Confirm the operating cycle and support reactions; additional attachments require their own approved load case.
Capacity, span, useful hook travel and mechanisms are confirmed together for the quoted unit.
| Parameter | Reference selection range | Procurement check |
|---|---|---|
| Rated Capacity | 75 t | Confirm the selected lifting rating and complete suspended load, including slings and attachments. |
| Hoisting mechanism class | M6 | Confirm the hoisting mechanism duty for the load spectrum, operating hours and lifting frequency. |
| Hoisting Speed | 1 / 10 m/min | Confirm the selected hoisting speed, approach control and positioning requirement for the stated capacity. |
| Maximum Lifting Height | Approx. +10 m above rail / 16.5 m below rail | Confirm hook travel above and below rail level, the pit depth and required upper hook clearance. |
| Trolley Gauge | 9,000 mm | Confirm the trolley rail centre spacing and compatibility with the bridge and trolley arrangement. |
| Crane Gauge / Span Reference | 30,000 mm | Confirm the runway rail centre-to-centre span and required hook coverage on the approved general arrangement drawing. |
| Trolley Travel Speed | 2 / 20 m/min | Confirm trolley speed, available travel and stopping position for the handling route. |
| Crane Travel Speed | 3 / 30 m/min | Confirm crane travel speed, runway travel and stopping requirements for the selected configuration. |
| Trolley Rail | P43 | Confirm the rail section, wheel compatibility, support reactions and installation tolerances for the selected configuration. |
| Crane Rail | 50 kg/m | Confirm the rail section, wheel compatibility, support reactions and installation tolerances for the selected configuration. |
| Maximum Wheel Pressure | 285 kN trolley-side reference / 248 kN crane-side reference in the configuration | Confirm the governing wheel reactions for the selected configuration and verify the runway and foundation design. |
| Power Supply | 3-phase AC 380 V / 50 Hz | Confirm site voltage, frequency, phase, connection capacity and the external power-feed scope. |
| Attachment and spoil container | Project-selected | Size the loaded container, turning system and discharge zone together. |
Specify empty and filled container mass, lifting points and the spoil characteristics. Size the hoist, turning system and discharge arrangement together, including rigging and attachment weight.
Show the shaft pickup depth, upper clearance, discharge opening, rail centres and runway length. Include load depth, hook approaches, obstacles and the complete turning envelope.
State loaded cycles per hour, shifts and positioning requirements. Match lifting, trolley and crane speeds to the shaft transfer and discharge sequence, with agreed controls and protection.
Provide runway or foundation capacity, power, truck access and destination requirements. Request reactions, selected mechanisms, inspection and site handover responsibilities in the complete offer.
Order one complete crane or define a project package. Itemise the gantry structure, hoist or trolley, spoil-container attachment, travel drives and controls.
Request the selected load, dimensions and mechanisms, arrangement drawing, reactions, operating and electrical information, applicable inspection/test records and destination conformity documents.
Agree the production, factory inspection and dispatch dates after configuration approval. Confirm packing, transport dimensions, freight route and unloading access separately from site work.
Define site readiness, personnel and equipment for assembly, electrical hookup, commissioning and load testing. Agree operator information, training and the factory/site acceptance requirements.
Put warranty duration and component coverage in the offer. Separate wear parts and site-service costs; agree installation guidance, engineer attendance and model-matched maintenance parts.
State the approved equipment, support or floor interfaces and each party’s responsibilities. Include shipping terms, installation boundaries, handover documents and after-sales response in the contract.
Request service and warranty terms ↗Review related equipment against your load, site geometry and operating cycle.
Check the selection, commercial scope and installation requirements before ordering.
No. It is one documented configuration. Size the crane and attachment for the filled container, rigging and site cycle.
No. Measure pickup below rail, container height, hoist overtravel and the discharge level. A different depth needs a new engineered selection.
Request a quotation for one crane or a project package; the offer should state the minimum quantity and complete supply scope.
Ask for calendar days from deposit and approved drawings to factory dispatch, with freight and site work shown separately.
Share the complete load, arrangement, rail centres, lift, duty, site conditions, destination and required delivery scope. We can return a model-specific drawing, selected specifications and a dated quotation.
Discuss your project