Skip to content
CRANE MANUFACTURER SINCE 2002
info@hnksglobal.com+86 188 3620 7779Project enquiry ↗
Henan Mine Crane Request a quote
HENAN MINE CRANE / ELECTRIC HOIST OVERHEAD CRANES

LHE Double-Trolley Electric-Hoist Crane

Two pickup points for long or unequal loads.

LHE provides two electric-hoist trolleys. They can support separate tasks or a coordinated lift when a designed load-sharing and control plan is supplied.

LHEModel designationProject-matchedRated load selection
Henan Mine Crane LHE Double-Trolley Electric-Hoist CranePRODUCT CONFIGURATION / LHE
THE LIFTING TASK

Designed for your handling path.

LHE provides two electric-hoist trolleys. They can support separate tasks or a coordinated lift when a designed load-sharing and control plan is supplied.

01 / APPLICATION

Where it fits

Long components and paired lifting

02 / EQUIPMENT

Crane arrangement

Electric Hoist Overhead Cranes with Two electric-hoist trolleys.

MODEL LHE

Technical configuration

Size the crane against the load, installation geometry and work cycle. The final equipment schedule follows the project drawings and operating brief.

Rated capacityEngineered for your load case
Crane spanMatched to your runway
Lifting heightMatched to your hook height
Duty classSelected for your operating cycle
Lifting systemTwo electric-hoist trolleys
Trolley / attachmentTwo trolleys
ControlTandem operation to confirm
Power supplyMatch voltage and frequency to the destination site
Runway and building interfaceCheck runway geometry, wheel loads and building reactions
Hook approach and clearanceConfirm required lifting envelope against the site drawings
BUYER'S SELECTION GUIDE

Specify the crane around the job.

Long components and paired lifting

Compare the Electric Hoist Overhead Cranes range ↗
01

Load and lifting attachment

Share the maximum lifted mass, load dimensions, center of gravity and any grab, magnet, spreader or lifting beam.

02

Runway and building interface

Confirm runway centers, wheel loads, building clearances and hook approaches.

03

Duty and controls

State typical load, lifts per hour, travel distance, shifts, control position and site power supply.

04

Model-specific check

Per-trolley and combined rating, hook spacing and tandem logic

TALK TO OUR ENGINEERS

Get a LHE crane proposal.

Send the load schedule and site drawings. We can configure the crane, lifting system and installation interface for your operating conditions.

Request a technical proposal ↗
  • Maximum lifted load and attachment
  • Span, travel length and available clearances
  • Daily lifting cycle and control choice
  • Power supply, environment and destination