Where it fits
Long loads and paired lifting
Two hook trolleys can lift independently or together when long loads need two controlled lifting points.
PRODUCT CONFIGURATION / QETwo hook trolleys can lift independently or together when long loads need two controlled lifting points.
Long loads and paired lifting
Overhead Cranes with Two hook sets.
Size the crane against the load, installation geometry and work cycle. The final equipment schedule follows the project drawings and operating brief.
Long loads and paired lifting
Compare the Overhead Cranes range ↗Share the maximum lifted mass, load dimensions, center of gravity and any grab, magnet, spreader or lifting beam.
Confirm runway centers, wheel loads, building clearances and hook approaches.
State typical load, lifts per hour, travel distance, shifts, control position and site power supply.
Combined load and trolley spacing
Review the equipment arrangement alongside your proposed site layout and lifting route.



Send the load schedule and site drawings. We can configure the crane, lifting system and installation interface for your operating conditions.
Request a technical proposal ↗