Long process components
Support long equipment, frames or process assemblies at separated lifting points when the workshop requires electrical isolation through the lifting system.
Bridge cranes for workshops and production lines.
Explore Overhead Cranes
Ground-supported lifting for yards and construction.
Explore Gantry Cranes
Wire rope and chain hoists for lifting points and cranes.
Explore Electric Hoists

Wire rope lifting and pulling with a powered drum.
Explore Electric Winches
Grab buckets, magnets and hooks for your load.
Explore Lifting Attachments & Grabs
Mobile handling for containers, precast and yard loads.
Explore Rubber-Tired Gantry Cranes & Straddle Carriers

Lift and move vessels through boatyards and marinas.
Explore Marine Travel Lifts
Ladle, slab, scrap and coil handling across steel production.

Container stacking and cargo transfers across terminals and rail.

Turbine installation, powerhouse maintenance and wind equipment assembly.

Controlled component transfer and positioning for precision assembly.

Heavy fabrication, production lifting and factory crane automation.

Process lifting for smelters, carbon blocks and anode materials.

Clean lifting and classified protection for sensitive process areas.

Bridge fabrication, metro construction and ship block assembly.

Automated storage and retrieval for plates, cables and bins.

Follow project dispatches, crane engineering and factory acceptance.

Dispatch, installation and equipment in service

Crane configurations and handling technology

Factory inspections, acceptance and test programmes

Company developments, people and community programmes
Handle a long component at two lifting points, or use the trolleys for separate process tasks, with electrical isolation integrated into the load path. QYE combines a double girder bridge with two insulated trolleys, encoder feedback and inverter control. Individual hook loads, combined bridge load and coordinated movement are selected for the equipment you handle.
Tell us what you need to lift and your approximate span. We’ll help you choose the lifting arrangement.

Start with the dimensions you already know. A workshop photo or sketch can help us recommend a configuration.
Position the trolleys to suit the component. Select each rating from the actual load reaction and specify the permitted combined bridge load.
Encoder and inverter control supports the ordered paired-lifting functions while insulating pads, sleeves and plates interrupt unwanted process-current paths.
Independent operation allows each trolley to handle its assigned task within agreed bridge loading and travel limits.

Support long equipment, frames or process assemblies at separated lifting points when the workshop requires electrical isolation through the lifting system.
Move equipment and maintenance loads around specified electrolytic process positions. Match isolation to every contact path involved in the paired lift.
Use either trolley for its assigned handling task. Define individual selection, combined loading and travel separation when both trolleys are active.
A paired lift is rated from both lifting-point reactions and complete bridge load. Hook spacing and permitted relative hook movement are specified for your component.
Compare the available options for your lifting task. Capacity, span, lift height and speed are matched in the selected configuration.
| Model | QYE |
|---|---|
| Bridge arrangement | Double girder overhead bridge |
| Trolley arrangement | Two insulated lifting trolleys |
| Load ratings | Individual lifting-point ratings plus maximum permitted combined bridge load |
| Span | Selected for runway rail-centre distance |
| Lifting height | Selected for pickup, transfer and placement levels |
| Working hook spacing | Minimum and maximum separation defined in the arrangement drawing |
| Working duty | Selected from load spectrum, operating frequency and shifts |
| Hoisting speed | Selected for individual and coordinated lifting cases |
| Trolley and bridge travel | Speed-control package selected for the handling cycle |
| Coordinated control | Encoder feedback and inverter control |
| Electrical isolation | Insulating pads, sleeves and plates at specified interfaces |
| Isolation acceptance | Test performance and inspection points defined for both lifting paths |
| Operator control | Operating station and trolley selection functions defined in the offer |
| Environment | Thermal, dust and corrosion conditions specified for the installation |
| Power supply | Three-phase voltage and frequency matched to the destination supply |
| Operating arrangement | Load basis | Movement and control | Configuration to confirm |
|---|---|---|---|
| One trolley in use | Its complete suspended load | Independent hook and trolley selection | Working coverage and unused trolley position |
| Two separate loads | Each trolley load plus combined bridge limit | Independent operation within agreed travel/load limits | Permitted simultaneous operating functions |
| One component on two lifting points | Actual reaction at each point plus total suspended load | Coordinated lifting with agreed relative movement | Hook spacing, geometry and acceptance tolerance |
| Process-connected equipment | All connected load paths and attachments | Specified sequence with electrical isolation maintained | Isolation interfaces and acceptance tests |
The offer states actual trolley ratings, combined load, speeds, separation and coordination limits. Single-trolley QY values do not define a QYE tandem configuration.
The views show the twin-trolley bridge arrangement. The ordered layout defines trolley travel, working separation, hook positions and insulation interfaces for the selected process.

Start with component weight and lifting points, then specify electrical isolation and paired movement. One technical offer brings these requirements together.

Provide the total suspended load and centre of gravity. Individual trolley ratings and maximum bridge load are defined separately.
State the shortest and longest required spacing. Trolley dimensions and the common track determine available travel and minimum separation.
Choose separate lifts or one shared component. Define acceptable relative hook-height difference and the required lifting/positioning speed for paired handling.
Identify process electrical conditions, heat and corrosion. Include both lifting paths, connecting attachments and relevant interfaces in the isolation design.
Compare the equipment, documentation, delivery and service scope for the configuration you need.
One complete QYE crane or a project batch; individual trolley ratings and quantity are listed in the offer.
Identify bridge, both insulated trolleys, hook sets, feedback/controls, insulation components, power feed, tests, freight, installation and spares.
Request individual/combined ratings, hook-spacing drawing, operating modes, paired-lift and insulation test requirements, electrical diagrams and manuals. Destination compliance documents are defined in the order.
Production is scheduled after lifting cases, insulation requirements and layout are agreed. Factory completion, dispatch, freight and site commissioning are stated separately.
Agree erection, travel/separation checks and commissioning of independent, paired and insulation functions. Remote guidance or on-site supervision, test loads and training are named services.
The order states warranty duration, commencement, covered hoists/drives/feedback/insulation parts, exclusions and service support. Recommended control and insulation spares can be included.
Find the arrangement, equipment options and order information that suit your application.
Choose QYE when the process needs two lifting trolleys and electrical isolation, such as a long component supported at two points or separate tasks on one bridge. QY serves applications where one trolley provides the required lifting arrangement.
Yes. Separate trolley and hoist selection can be provided. The offer defines permitted combined load and simultaneous movements when both trolleys are in use.
Yes, a coordinated lift can be specified. Lifting-point reactions, combined suspended load and component balance are considered together; the load need not divide equally between the hooks.
The tandem limit is stated separately. It depends on permitted bridge loading, individual lifting-point loads, component geometry and the ordered operating arrangement.
Encoder and inverter feedback supports the specified coordination functions. State acceptable relative hook-height difference or component tilt so control and acceptance requirements match the process.
The arrangement drawing defines travel and minimum separation. Trolleys on a common track should not be assumed to pass each other; a crossing requirement needs a separately reviewed layout.
The design considers both lifting paths and any component or attachment connecting them. The offer identifies insulation interfaces and inspection/test requirements for the complete arrangement.
Electrical and thermal performance is selected for the process. Provide process voltage/current conditions, ambient temperature and heat exposure; the technical offer states insulation performance and materials.
Send total load, lifting-point reactions, component length, hook spacing, span, lift height and electrical process conditions. State separate or paired operation and destination power supply.
The quotation confirms production timing, warranty, insulation/paired-lift test records and installation support. Freight, commissioning, training and spare insulation/control parts are itemized.
Tell us what you need to lift, your project location and any dimensions you already know. We’ll help you choose a suitable configuration.
info@cranehenanmine.com