Component and rigging schedule
Indonesia Thermal Power Plant Installation
Powerhouse construction needs reliable high-capacity lifting at a remote project site, with delivery and installation interfaces planned before the plant is complete.

Start with the component and the lift route.
Powerhouse construction needs reliable high-capacity lifting at a remote project site, with delivery and installation interfaces planned before the plant is complete.
The lifted component, rigging, building clearances and control sequence need to be reviewed as one operating system.
Prepare the technical brief ↗Powerhouse and runway drawings
Erection and commissioning sequence
Future overhaul lift requirements
Support turbine and plant-equipment lifts during overseas construction.
Specify the bridge cranes from the heaviest unit, construction sequence and building layout. Confirm runway completion, hook coverage, low-speed positioning and handover tests so the same equipment can support later maintenance.

Coordinate site delivery
Match crane arrival and erection to the powerhouse build schedule.
Lift major equipment
Move the unit from its laydown point to the installation centerline.
Hand over for service
Test controls and preserve future maintenance access.
Construction interfaces
Check temporary access, power and runway readiness at the overseas site.
Lifecycle use
Do not size only for the first installation lift; review overhaul duties too.
Morowali thermal power project
The project used two 120 t new-design double-girder bridge cranes for an Indonesian thermal plant project involving three 380 MW generating units.




Define the operating brief before fixing a crane model.
Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.
| Input | Information needed for this application | Confirm in the technical offer |
|---|---|---|
| 01 / Site requirement | Component and rigging schedule | Rated load including the attachment, lifting-point arrangement and load cases. |
| 02 / Site requirement | Powerhouse and runway drawings | Crane span, lifting height, headroom, wheel loads and runway or foundation interfaces. |
| 03 / Site requirement | Erection and commissioning sequence | Duty classification, speeds and control behaviour matched to the agreed operating cycle. |
| 04 / Site requirement | Future overhaul lift requirements | Protection, positioning, interlocks, monitoring and safe recovery requirements. |
| Destination and delivery | Country, project standards, quantity, freight and site services. | Documents, inspection and testing, packing, installation support and agreed delivery milestones. |
Send the available load schedule and drawings. The missing inputs can be identified during technical review.
Discuss your project ↗Compare the complete lifting package.
The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.
Engineering
General arrangement, load basis, runway and utility interfaces, control and protection schedule.
Manufacture & inspection
Approved drawings, inspection plan and factory testing for the selected configuration.
Shipping & site work
Packing, freight, erection support, commissioning and operator training as specified.
Handover
Test records, manuals, maintenance instructions and agreed spare-parts list.
Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.
Compare equipment for this operating task.
These product families and related applications provide a starting point. Final selection follows the load and site review.
Before you request a quotation.
What information is needed to specify this crane solution?
Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.
Can the crane be configured for our powerhouse or factory?
Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.
What are the order quantity, certification and lead time?
We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.
Send your project brief. Get a crane proposal built around your process.
Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.
Send your project requirements ↗