Largest machine component and rigging
Tunneling Equipment Factory Crane Fleet
Non-excavation equipment manufacturing needs repeated movement of large structures through fabrication and assembly, often across several tall workshop bays.

Start with the load and the production route.
Non-excavation equipment manufacturing needs repeated movement of large structures through fabrication and assembly, often across several tall workshop bays.
The lifted load, rigging, building clearances and control sequence need to be reviewed as one operating system.
Prepare the technical brief ↗Bay heights and runway plan
Assembly schedule
Fleet maintenance and traffic rules
Serve large tunneling-machine assemblies across a high-bay factory.
Plan the crane fleet from the component route, building columns and assembly stations. Allocate capacity to each bay, allow controlled positioning of large parts and standardize service where the installed fleet grows.

Move fabricated sections
Define lift points and temporary supports for the largest tunneling-machine parts.
Feed assembly
Provide hook coverage at welding and final assembly stations.
Maintain throughput
Coordinate runway traffic and inspections across the fleet.
High-bay geometry
Check hook approach and lifting height within the 25 m high workshop environment.
Fleet support
Keep spare parts and inspection procedures coherent across many installed cranes.
Tangxing Equipment production park
Henan Mine Crane delivered more than 100 heavy cranes for Tangxing's non-excavation equipment park, where they support tunneling-equipment production in high-bay steel-structure workshops.


Define the operating brief before fixing a crane model.
Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.
| Input | Information needed for this application | Confirm in the technical offer |
|---|---|---|
| 01 / Site requirement | Largest machine component and rigging | Rated load including the attachment, lifting-point arrangement and load cases. |
| 02 / Site requirement | Bay heights and runway plan | Crane span, lifting height, headroom, wheel loads and runway or foundation interfaces. |
| 03 / Site requirement | Assembly schedule | Duty classification, speeds and control behaviour matched to the agreed operating cycle. |
| 04 / Site requirement | Fleet maintenance and traffic rules | Fleet maintenance access, inspection windows, shared-runway traffic rules, control authority and fault recovery agreed for each bay. |
| Destination and delivery | Country, project standards, quantity, freight and site services. | Documents, inspection and testing, packing, installation support and agreed delivery milestones. |
Send the available load schedule and drawings. The missing inputs can be identified during technical review.
Discuss your project ↗Compare the complete lifting package.
The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.
Engineering
General arrangement, load basis, runway and utility interfaces, control and protection schedule.
Manufacture & inspection
Approved drawings, inspection plan and factory testing for the selected configuration.
Shipping & site work
Packing, freight, erection support, commissioning and operator training as specified.
Handover
Test records, manuals, maintenance instructions and agreed spare-parts list.
Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.
Compare equipment for this operating task.
These product families and related applications provide a starting point. Final selection follows the load and site review.




Before you request a quotation.
What information is needed to specify this crane solution?
Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.
Can the lifting system be configured for our load and factory?
Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.
What are the order quantity, certification and lead time?
We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.
Send your project brief. Get a crane proposal built around your process.
Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.