Part masses and pickup points
Construction Machinery Factory Crane Network
A construction-equipment factory moves large weldments and assemblies through many production cells, so crane coverage is a plant-wide planning issue.

Start with the load and the production route.
A construction-equipment factory moves large weldments and assemblies through many production cells, so crane coverage is a plant-wide planning issue.
The lifted load, rigging, building clearances and control sequence need to be reviewed as one operating system.
Prepare the technical brief ↗Plant bay and line layout
Peak concurrent lifts
Fleet maintenance strategy
Keep structural fabrication and equipment assembly supplied by a large crane fleet.
Map the part flow and allocate suitable cranes by bay. Precision positioning and smart controls can support assembly, while common fleet procedures help operators and maintenance teams manage many installed units.

Trace part movement
List the heavy structures passing through fabrication and assembly.
Assign bay coverage
Set capacity, span and approach for each production area.
Coordinate maintenance
Schedule inspections and spare support without stopping all lines.
Production overlap
Avoid crane and workstation conflicts during peak assembly periods.
Fleet standardization
Keep training and service interfaces consistent across mixed crane types.
XCMG intelligent-manufacturing cooperation
Henan Mine Crane delivered more than 300 cranes of various types to XCMG for assembly and structural-production material handling.





Define the operating brief before fixing a crane model.
Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.
| Input | Information needed for this application | Confirm in the technical offer |
|---|---|---|
| 01 / Site requirement | Part masses and pickup points | Rated load including the attachment, lifting-point arrangement and load cases. |
| 02 / Site requirement | Plant bay and line layout | Crane span, lifting height, headroom, wheel loads and runway or foundation interfaces. |
| 03 / Site requirement | Peak concurrent lifts | Duty classification, speeds and control behaviour matched to the agreed operating cycle. |
| 04 / Site requirement | Fleet maintenance strategy | Protection, positioning, interlocks, monitoring and safe recovery requirements. |
| Destination and delivery | Country, project standards, quantity, freight and site services. | Documents, inspection and testing, packing, installation support and agreed delivery milestones. |
Send the available load schedule and drawings. The missing inputs can be identified during technical review.
Discuss your project ↗Compare the complete lifting package.
The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.
Engineering
General arrangement, load basis, runway and utility interfaces, control and protection schedule.
Manufacture & inspection
Approved drawings, inspection plan and factory testing for the selected configuration.
Shipping & site work
Packing, freight, erection support, commissioning and operator training as specified.
Handover
Test records, manuals, maintenance instructions and agreed spare-parts list.
Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.
Compare equipment for this operating task.
These product families and related applications provide a starting point. Final selection follows the load and site review.
Before you request a quotation.
What information is needed to specify this crane solution?
Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.
Can the lifting system be configured for our load and factory?
Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.
What are the order quantity, certification and lead time?
We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.
Send your project brief. Get a crane proposal built around your process.
Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.