Prepare the segment
Confirm rigging, total mass and lift-point balance.
High-speed rail construction may combine very heavy components, high lift and damp or dusty work areas, leaving little tolerance for load swing.
Henan Mine Crane equipment for High-speed rail construction project
High-speed rail construction may combine very heavy components, high lift and damp or dusty work areas, leaving little tolerance for load swing.
Build the 500 t double-girder lift plan from the component, tunnel or worksite route and the final placement point. Synchronize hooks, select low-speed control and monitor the operation through the complete construction cycle.
Follow the load through the operation to see where lifting equipment, tooling and controls must work together.
Confirm rigging, total mass and lift-point balance.
Use high lift and synchronized hooks with anti-sway control.
Reduce speed and observe load and crane status before final release.
These choices affect safety, process fit and the operating life of the installation.
Check humidity, dust, temporary power and access before selecting components.
Define acceptable swing and placement tolerances in the site method statement.
See how cranes and lifting systems were configured for demanding operating environments.

The project used a 500 t new-design double-girder crane placed into service at a high-speed rail project, with synchronized hooks, electrical anti-sway and digital and visual monitoring.
These product families support the handling tasks above. The final crane and attachment are selected from the site brief.
Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.
Prepare your enquiry ↗Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.
Start a project enquiry ↗