Vehicle and component dimensions
Metro Depot Maintenance Crane System
A metro depot needs crane coverage for car maintenance and equipment removal throughout the operating life of the line.

Start with the load and the process route.
A metro depot needs crane coverage for car maintenance and equipment removal throughout the operating life of the line.
The load, lifting attachment, building interface and operating sequence need to be reviewed together.
Prepare the technical brief ↗Depot bay and runway drawings
Maintenance lift frequency
Operator and inspection plan
Keep vehicle overhaul lifts available after a railway opens.
Map repair bays, vehicle clearance and lifted assemblies, then allocate workshop cranes to the depot and parking areas. Design hook approach, safe access and maintenance procedures around vehicles in service.

Bring a vehicle to the bay
Confirm the repair position and access for crane movement.
Lift the assembly
Use the designated attachment and maintain clearance from the car body.
Return to service
Record the lift and clear the bay for inspection or reassembly.
Vehicle clearance
Check hook position and load swing over parked rolling stock.
Operating continuity
Schedule crane inspections around depot maintenance windows.
Lahore Orange Line metro depot
The project involved 32 cranes of various types for the Lahore Orange Line metro project, primarily serving maintenance and commissioning in the depot and parking areas.





Define the operating brief before fixing a crane model.
Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.
| Input | Information needed for this application | Confirm in the technical offer |
|---|---|---|
| 01 / Site requirement | Vehicle and component dimensions | Complete vehicle/component mass, attachment mass, lifting points and load cases. |
| 02 / Site requirement | Depot bay and runway drawings | Crane span, lifting height, headroom, wheel loads and runway or foundation interfaces. |
| 03 / Site requirement | Maintenance lift frequency | Duty classification, speeds and control behaviour matched to the agreed operating cycle. |
| 04 / Site requirement | Operator and inspection plan | Operator locations, visibility, inspection access, witness points and handover records. |
| Destination and delivery | Country, project standards, quantity, freight and site services. | Documents, inspection and testing, packing, installation support and agreed delivery milestones. |
Send the available load schedule and drawings. The missing inputs can be identified during technical review.
Discuss your project ↗Compare the complete lifting package.
The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.
Engineering
General arrangement, load basis, runway and utility interfaces, control and protection schedule.
Manufacture & inspection
Approved drawings, inspection plan and factory testing for the selected configuration.
Shipping & site work
Packing, freight, erection support, commissioning and operator training as specified.
Handover
Test records, manuals, maintenance instructions and agreed spare-parts list.
Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.
Compare equipment for this operating task.
These product families and related applications provide a starting point. Final selection follows the load and site review.
Before you request a quotation.
What information is needed to specify this crane solution?
Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.
Can the crane system be configured for our site and process?
Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.
What are the order quantity, certification and lead time?
We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.
Send your project brief. Get a crane proposal built around your process.
Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.
Send your project requirements ↗

























