Skip to content
Henan mine crane co., ltd. Get a project quote
Home/Case studies/Bridge, Rail & Shipbuilding/Two 100 t Spoil-Handling Gantries for the Guangfo Railway Project
PROJECT CASE / BRIDGE, RAIL & SHIPBUILDING

Two 100 t Spoil-Handling Gantries for the Guangfo Railway Project

Two double-girder gantry cranes lift tunnel spoil and construction materials with below-rail attachment depth reaching 40 m.

Gantry crane above a metro shaft excavation site
Gantry crane above a metro shaft excavation site.
INDUSTRYBridge, Rail & Shipbuilding
LOCATIONGuangdong, China
Quantity2 double-girder gantry cranes
PROJECT STAGEConstruction-site application
01 / PROJECT CONTEXT

The project and its handling task.

Henan Mine Crane supplied two 100 t double-girder gantry cranes for China Railway First Group’s Guangfo Ring intercity railway works between Foshan West and Guangzhou North.

The cranes are designed for spoil and material handling during underground rail construction. The lifting attachment can operate as deep as 40 m below rail level. Computer-assisted structural design and protective arrangements for travel and hoisting address the project’s site conditions.

02 / HANDLING REQUIREMENTS

Lift spoil and construction supplies from a deep rail-worksite shaft.

Metro construction needs repetitive vertical lifting where personnel, vehicles and shaft-edge geometry create distinct hazards.

Spoil bucket and other load schedule

Check bucket capacity and lifting attachment at the excavation level.

Shaft depth and edge geometry

Manage the vertical path and shaft-edge clearance.

Surface vehicle route

Move spoil to the planned vehicle or stockpile point.

Hoist, limit and emergency requirements

Move spoil to the planned vehicle or stockpile point.

Gantry crane above a metro shaft excavation site
Gantry crane above a metro shaft excavation site.
03 / SUPPLIED SYSTEM

The equipment behind this project.

The cranes are designed for spoil and material handling during underground rail construction. The lifting attachment can operate as deep as 40 m below rail level. Computer-assisted structural design and protective arrangements for travel and hoisting address the project’s site conditions.

  • Quantity2 double-girder gantry cranes
  • Rated capacity100 t each
  • Below-rail attachment depthUp to 40 m
  • ApplicationTunnel spoil and construction-material lifting
  • ProtectionSafety devices on principal travel and hoisting movements
Explore the application solution ↗
04 / ENGINEERING DECISIONS

What to compare with your own project.

Match the project configuration to your load, layout and operating sequence before selecting a crane package.

Design areaThis project configurationDefine for your site
Quantity2 double-girder gantry cranesRequired crane quantity, work zones and simultaneous handling operations.
Rated capacity100 t eachMaximum spoil-bucket, rigging and other suspended mass for each lifting task.
Below-rail attachment depthUp to 40 mRail elevation, shaft depth and required attachment travel below rail level.
ApplicationTunnel spoil and construction-material liftingSpoil and construction-material handling routes, pickup points and discharge sequence.
ProtectionSafety devices on principal travel and hoisting movementsRequired travel and hoist limits, overload protection, emergency stops and acceptance tests.
05 / PROJECT PHOTOGRAPHS

See the equipment and working environment.

Explore the equipment arrangement and handling environment.

06 / PROJECT OUTCOME

Construction-site application.

The cranes serve spoil and material lifts at the Guangfo railway construction site. Their deep below-rail handling arrangement connects the surface gantry to the underground excavation work.

For a similar project, configure a dual-girder spoil gantry around the shaft, bucket or lifting gear and surface transfer point. Define the under-rail lift depth, hoist travel, controlled release and protected walking/vehicle routes.

07 / PLAN A SIMILAR PROJECT

Prepare a comparable crane quotation.

Share the load schedule and site drawings. Configure a dual-girder spoil gantry around the shaft, bucket or lifting gear and surface transfer point. Define the under-rail lift depth, hoist travel, controlled release and protected walking/vehicle routes.

We can quote a single crane or a coordinated fleet. The offer sets out the destination standards, required certificates and inspection records, manufacturing programme after drawing approval, shipment, installation support and agreed acceptance scope.

  1. Spoil bucket and other load schedule
  2. Shaft depth and edge geometry
  3. Surface vehicle route
  4. Hoist, limit and emergency requirements
  5. Destination standards, quantity and inspection documentation
  6. Manufacturing programme, shipment, commissioning, training and spares
BUYER QUESTIONS

Questions before specifying a similar crane.

Can the same project crane be supplied for my site?

We customize the capacity, span, lifting height, attachment and controls to the load, building or yard layout and operating cycle. Specify the spoil bucket and all other planned loads before final equipment selection.

How are certification, quantity and lead time agreed?

Single-crane and fleet enquiries are welcome. Define the destination and required standards in the enquiry. The project offer confirms certification and inspection documents, the quantity, drawing approval and manufacturing schedule, with the shipping and site-service boundaries.

What should acceptance and after-sales support include?

Agree the inspection plan, representative load and functional tests, operator training, maintenance instructions, spare-parts scope and fault-recovery procedures. For this application, include hoist, limit and emergency requirements in the technical review.

BRIDGE, RAIL & SHIPBUILDING PROJECT ENQUIRY

Planning a similar lifting project?

Send your layout, load and operating requirements. We can develop a customized crane package and delivery scope for your site.

Request a technical proposal ↗