| Review year | 2021 |
| Applications | Steelmaking, heavy manufacture, aerospace and logistics |
| Production described | More than one hundred thousand cranes and equipment sets |
| Sales revenue | RMB 7.4 billion |
Steelmaking and heavy-manufacturing milestones
The review includes two 200 t four-girder casting cranes for Jinhui and a 400/100 t overhead crane for Jiangsu Shengang. Earlier factory inspections covered several steel-project packages.
A 72 m-span crane supported bridge construction, while new-design equipment was supplied for wind-energy manufacture.
Specialised projects reach different acceptance stages
A 160 + 160 t explosion-proof overhead crane for an aerospace project passed a load test in December. Two container gantry cranes were delivered for Taicang Port during the same period.
The milestones differ by project: inspection, load testing and delivery are distinct stages within an equipment programme.
Manufacturing development accompanies the project work
The company described production of more than one hundred thousand cranes and equipment sets and sales revenue of RMB 7.4 billion during 2021. Component partnerships and employee training formed another part of the year.
For a new order, select the crane arrangement from the actual load, attachment, environment and production cycle. Define the required inspections and delivery programme within the technical agreement.

























