Skip to content
Henan mine crane co., ltd. Get a project quote
MEN / Double-trolley magnet and hook duties

MEN Double-Trolley Electromagnetic and Hook Gantry Crane

MEN combines electromagnetic and hook handling in a double-trolley arrangement with PLC, HMI and WLK control equipment. State the load and required trolley functions separately for each mode. Compare magnet circuitry, hook equipment and useful coverage, with permitted movements and the handling sequence defined in the selected schedule.

Handling
Electromagnetic and hook duties
Trolleys
Double trolley
Controls
PLC, HMI and WLK master controller
MEN complete gantry arrangement, view 1
MEN gantry arrangement — manufacturer rendering.Product arrangement rendering
01 / APPLICATIONS

Where the MEN
fits the work.

01

Mixed steel and component handling

A work area may need magnetic pickup for suitable steel and hook handling for components or packaged loads. Define each task so its load and attachment are assessed separately.

02

Steel transfer and stacking

Use the electromagnetic arrangement for suitable steel material moving between storage and transfer positions. The material form and stack levels guide the magnet, working height and usable coverage.

03

Separated lifting positions

Where the process needs two trolley positions, show the lifting points and operating sequence. Any joint handling must be defined within the selected control and load limits.

02 / TECHNICAL SPECIFICATIONS

MEN specifications
and equipment configuration.

Compare the lifting mechanism, control functions and site interfaces for the selected crane.

MEN technical specifications and configuration
ModelMENTrolley arrangementDouble trolley
Handling modesElectromagnetic and hook handlingWorking-class rangeA3–A8; select the class for the operating cycle
Control platformPLC module integrated with the control stationOperator interfaceHMI touch-screen interface
Master controllerWLK master controllerController functionsDefined operating steps, zero-return and locking functions
Magnet actuationPickup and release through electrical current switchingStructural designMain-girder, leg and end-girder stress distribution optimised by finite-element analysis
Cantilever arrangementOne side, both sides or no cantilever, according to the selected layoutRated lifting capacitySpecify complete suspended load for each hook and electromagnetic handling mode
SpanRail-centre span selected for the working areaLifting heightHook and magnet working heights selected for pickup and stacking levels
Trolley coordinationPermitted independent and coordinated functions defined for the processMagnet packageMagnet type, suspension, power circuit and required holding / release functions specified
Steel materialSpecify material form, dimensions and relevant operating temperatureDuty and handling rateSelected for the actual pickup, travel, release and return cycle
Motion speedsLifting and travel speeds selected for controlled material placementSite electrical supplyVoltage, frequency, phases and crane / magnet power-feed interfaces specified

Capacity, span, lifting height and duty are selected together. The agreed equipment schedule and drawing define your crane configuration.

03 / EQUIPMENT VIEWS

See the MEN arrangement.

Review the original equipment views alongside the selected crane drawing.

MEN complete gantry arrangement, view 1
MEN gantry arrangement — manufacturer rendering, view 1.
MEN complete gantry arrangement, view 2
MEN gantry arrangement — manufacturer rendering, view 2.
MEN complete gantry arrangement, view 3
MEN gantry arrangement — manufacturer rendering, view 3.
04 / CONFIGURATION

Choose the MEN equipment and site interfaces.

01 / OPTION

Separate hook and magnet loads

For each trolley and operating mode, state hook cargo plus rigging, or magnet, suspension and material. Select the magnet for material form, condition and temperature; agree pickup, holding, release and any required backup functions.

02 / OPTION

Trolley coverage and duty

Show lifting points, load geometry, useful separation, stacking and hook-handling positions. Agree independent/joint functions, permitted shared loads and mode limits. Choose one-sided, two-sided or no cantilever with lift, speeds, load spectrum and shifts.

03 / OPTION

Control platform and sequence

The described station includes PLC, HMI touch screen and WLK master controller with operating steps, zero-return and locking. Magnet pickup and release use electrical-current switching. Agree mode selection, indications, permitted commands and operator observation for the actual handling sequence.

04 / OPTION

Electrical and site interfaces

Identify site supply, crane and magnet power feeds and selected suspension connections. Coordinate runway reactions, outdoor exposure and access to electrical and mechanical equipment. Keep the material assumptions and the supplied attachment functions explicit in the equipment schedule.

05 / PURCHASING & DELIVERY

Confirm the complete MEN supply scope.

ORDER

Order quantity

Enquire for one MEN or a multi-crane system. Send the loads in each mode, estimated span, lifting height and destination, with a short description of the material flow.

QUOTATION

Equipment and quotation scope

Compare trolley and hook equipment, magnet package, electrical functions, PLC/HMI scope and included site interfaces. Rails, power feed, freight and installation should be identified separately where applicable.

DOCUMENTS

Drawings and equipment documents

Agree the arrangement, attachment and load schedules, control description, electrical diagrams and operating instructions for the permitted hook and electromagnetic functions.

ACCEPTANCE

Standards and acceptance

State destination standards and required documents. Define functional checks and load-test scope for the modes being purchased, with magnet demonstrations and third-party inspection agreed where required.

DELIVERY

Delivery and installation

Confirm the production and delivery schedule after the equipment and control functions are selected. Allocate mechanical assembly, electrical installation and mode commissioning responsibilities.

SUPPORT

Warranty and spare parts

Include operator instruction on mode selection and magnet functions. Record warranty terms, starting point, service arrangements and spare parts for the supplied crane, controls and attachment.

CONTINUE YOUR COMPARISON

Compare related
gantry arrangements.

All 16 double-girder gantry models ↗
07 / QUESTIONS BEFORE ORDERING

Choose the MEN
with the job in view.

Compare the handling task, selected lifting equipment and supply scope before ordering.

How does MEN differ from MC?

MEN combines a double-trolley arrangement with electromagnetic and hook duties. MC is presented as an electromagnetic handling model. Compare the actual number of lifting points, required handling modes and supplied attachment and control schedules.

Are both trolleys automatically permitted to lift together?

The selected control and load schedule must define the permitted functions. Provide the lifting-point spacing and load distribution for any joint task so its operating modes and shared-load limits can be specified.

Does changing from magnet to hook require a quick connector?

The supplied attachment arrangement and changeover method must be identified for the selected MEN. A quick-change mechanism is not established by the model name. Describe how often modes change and how the attachments will be handled.

What do the PLC and HMI add to the offer?

They provide the stated control platform and operator interface. Agree the actual mode selections, indications and functions included; their presence alone does not establish a particular automatic process or remote integration.

How is the magnet controlled?

The electromagnetic pickup and release functions use electrical current switching. The selected package should identify its power circuit, required holding and release behaviour and any specified backup equipment.

Can the stated cycle be guaranteed from a response-time figure?

A magnet response is only one part of pickup, lift, travel, release and return. Discuss the complete route, material and load per cycle when agreeing handling requirements and the selected working class.

Which loads should I state?

Provide each hook-handled load with its rigging, and each magnetic material load together with magnet and suspension weight. Include individual trolley needs and any proposed shared handling case.

Can the first enquiry leave control details open?

Yes. Start with the loads, estimated span, lifting height, destination and intended tasks. The control functions and attachment arrangement can be developed while unknown dimensions and mode details are confirmed.

08 / YOUR MEN GANTRY PROJECT

Get a quotation
for your MEN crane.

Tell us what you lift, the approximate span, the required lifting height and your destination. If a dimension is unknown, describe the task and leave that field open.

  • An arrangement matched to the lifting task
  • A clear equipment and service scope
  • Delivery and support terms in the offer

info@cranehenanmine.com

PRODUCT SELECTEDMEN Double-Trolley Electromagnetic and Hook Gantry Crane

Not sure about a dimension? Leave it blank. A site sketch is helpful when available.

MEN gantry craneDiscuss your lifting task
Request a quote ↗
MEN equipment gallery
Enlarged MEN crane image

↑