Skip to content
Henan mine crane co., ltd. Get a project quote
KSSLS / THREE COMPACT ELECTRIC HOIST TROLLEYS

KSSLS Three Trolley Electric Hoist Overhead Crane

Handle large paper-machine components and serve maintenance positions with three electric-hoist trolleys on one double-girder bridge. KSSLS uses compact new-design hoists, dual-speed lifting and variable-frequency travel. Select each trolley for its assigned lifting task, then define the hook combinations needed for component removal, transfer and reinstallation.

HELP CHOOSING YOUR CRANE

Send the main components you need to handle and their lifting positions. We can help plan the three trolley ratings and working combinations.

Lifting positions
3 electric-hoist trolleys
Primary application
Paper-machine maintenance
Hoisting
Normal & positioning speeds
Horizontal travel
Variable-frequency drives
Large-workpiece handlingMill-specific lifting combinations

Start with the dimensions you already know. A workshop photo or sketch can help us recommend a configuration.

01
Several lifting positions on one bridge

Three trolley positions let the crane serve different component and maintenance tasks within the bay. Each lifting unit is sized for its assigned load.

02
Approach equipment at a suitable speed

Dual-speed hoisting provides a slower approach when removing or replacing a component. VFD travel controls movement along the production and maintenance route.

03
A compact maintenance platform

C-shaped hoists and large-diameter drums keep the lifting arrangement compact. Optional equipment monitoring can support the maintenance plan for the supplied crane.

KSSLS bridge crane showing three hoist units and three suspended hooks
Three lifting positions on one bridge
01 / APPLICATIONS

Plan lifting around the paper machine and its maintenance jobs.

01

Large-component removal

Position the selected hooks at a component's lifting points for a planned removal or replacement. Load distribution and permitted combinations follow the machine-maintenance arrangement.

02

Mill maintenance positions

Serve several equipment pickup and landing points with the three trolley positions, using the individual lifting unit selected for each task.

03

Component transfer & reassembly

Move a removed assembly to its maintenance position and return it for installation. Specify lower-speed placement and any coordinated-hook requirement for the final approach.

Three trolleys do not establish an unrestricted three-hook combined rating. The offer identifies each hoist rating and every permitted lifting combination.

02 / TECHNICAL SPECIFICATIONS

KSSLS specifications and configuration options

Compare the available options for your lifting task. Capacity, span, lift height and speed are matched in the selected configuration.

ModelKSSLS
Bridge arrangementDouble girder overhead bridge
Trolley quantity3
Lifting mechanismThree compact new-type electric-hoist trolleys
Rated capacityThree individual hoist ratings and specified combined-load cases
SpanMatched to runway rail-centre distance
Lifting heightMatched to component pickup and landing levels
Trolley spacingWorking separation and approach limits selected for the machine layout
Crane dutySelected from the component load spectrum and operating frequency
HoistingDual-speed normal and positioning lifting
Trolley & bridge travelVariable-frequency drives
Operating combinationsIndividual and project-defined coordinated modes
Hoist layoutCompact C-shaped arrangement with large-diameter rope drums
Primary usePaper-industry large-workpiece handling and equipment maintenance
Monitoring optionRemote equipment monitoring and maintenance functions
Power supplyThree-phase voltage and frequency matched to the destination supply

Compare model configurations

Mill lifting jobLoad informationWorking arrangementControl selection
Individual component liftMaximum load on the selected hoistOne defined trolley and hook positionIndividual operation and travel limits
Component needing separated supportsLoad reactions at each selected lifting pointA specified hook pair or other reviewed combinationAgreed coordination, combined rating and interlocks
Several maintenance positionsComponent list and maximum load at each positionThree hoist positions sized for their assigned tasksOperating combinations matched to the mill workflow

Each lifting job has an agreed hook combination and load case. Individual capacities, spacing, speeds and coordination limits are confirmed in the technical offer.

03 / EQUIPMENT VIEWS

Compare the three hoist positions on the bridge.

The equipment views show how the three new-type hoist trolleys are arranged. Use the component lifting-point layout and maintenance positions to select their working range.

KSSLS double-girder overhead crane with three electric-hoist trolleys
KSSLS three-hoist crane arrangement
KSSLS three-trolley electric-hoist overhead crane viewed from below
KSSLS bridge and hook arrangement
04 / CONFIGURATION

Build the crane around the mill's lifting schedule.

A short list of components, weights and lifting points is the starting point. Trolley ratings, spacing and control functions can then be matched to the maintenance work.

KSSLS three-trolley electric-hoist overhead crane viewed from below
KSSLS bridge and hook arrangement
01 / OPTION

Three individual hoist ratings

List the maximum load required at each hook, including attachments. Equal hoist capacities are not required unless the selected jobs call for them.

02 / OPTION

Allowed hook combinations

Identify single-hook tasks and any paired or other coordinated lift required by the process. Agree the combined loads, relative movement and operating interlocks for each selected combination.

03 / OPTION

Component & station reach

Specify the lifting-point spacing, pickup and landing levels, span and maintenance positions. Trolley clearances and travel limits are matched to the actual working range.

04 / OPTION

Speed, environment & support

Choose the normal and positioning speeds for the task, then match VFD travel, working duty, controls and power supply. Include humidity, dust, temperature and any monitoring requirement in the enquiry.

05 / PURCHASING & DELIVERY

What comes with your KSSLS crane?

Compare the equipment, documentation, delivery and service scope for the configuration you need.

ORDER QUANTITY

Order the crane you need

Request one KSSLS crane for the mill bay or a project quantity, with all three hoist ratings and required lifting combinations.

QUOTATION

See the equipment included

Identify the bridge, three hoist trolleys, controls, feedback devices, power feed, lifting attachments, monitoring, packing, transport, installation and spares as separate scope items.

DOCUMENTS

Documents for your destination

Specify the crane arrangement, three trolley ratings, permitted lifting combinations, operating-mode description, electrical drawings, manuals, test records and destination compliance documents.

DELIVERY

Plan production and dispatch

Agree production and dispatch after the mill component list, trolley arrangement, load cases and control functions are selected. Include factory testing, shipping and site commissioning in the project schedule.

INSTALLATION

Installation and commissioning support

Define bridge assembly, hoist setup, electrical connection, testing of the ordered operating combinations and operator handover, with local equipment and site responsibilities agreed.

WARRANTY & SPARES

Know the warranty and support scope

The offer confirms warranty duration and coverage for all supplied hoists, drives and controls. Identify the service contact, recommended operating spares and support scope for monitoring or process interfaces.

07 / BUYER QUESTIONS

Answers for your KSSLS crane purchase

Find the arrangement, equipment options and order information that suit your application.

What is KSSLS mainly used for?

KSSLS is a three-trolley electric-hoist crane for large-workpiece handling and equipment maintenance in the paper industry. Its configuration follows the components, lifting points and maintenance positions in the mill.

When is a third hoist trolley useful?

A third trolley is useful when the machine-maintenance plan needs another selectable lifting position or different hook combinations for component removal and replacement. Choose the arrangement from the actual job list and lifting points. KSSLE is the two-trolley alternative when two positions cover the required tasks.

Do all three hoists need the same load rating?

Each hoist is selected for its assigned maximum load and operating cycle. Send the heaviest component at each lifting position and any shared-load cases so the three ratings can be chosen together.

Can all three hooks support one load at the same time?

Only a combination specified and rated for that load case should be used. The technical offer identifies individual and combined ratings, hook spacing, coordinated functions and operating interlocks; the three hoist capacities should not simply be added together.

Are slower speeds available for reinstalling equipment?

The new-type hoist platform uses normal and positioning lifting speeds with VFD travel. Specify the placement task and required approach speed so the hoists and drive package can be selected for component installation and removal.

What is needed to choose trolley spacing?

Send a machine layout or sketch showing the components, their lifting points and the pickup and landing positions. Include the shortest and longest lifting-point distances if known. The crane arrangement defines the trolley working ranges, approaches and required separation for those tasks.

What is the difference between KSSLS, KSSLE and QES?

KSSLS uses three new-type electric-hoist trolleys; KSSLE uses two. QES is a three-trolley hook-crane alternative using its own lifting and process-control arrangement. Compare the required loads, duty and operating combinations when selecting the platform.

Can it be specified for my mill's electrical supply and environment?

Yes. Include the site voltage and frequency, temperature, humidity, dust and operating shifts. The offer identifies the electrical and environmental package, as well as any requested monitoring or process interfaces.

What delivery, warranty and installation information will I receive?

The quotation defines the crane quantity, production and test schedule, documentation, warranty coverage and site-service scope. Installation and commissioning should include the agreed trolley combinations and component-handling functions, followed by operator handover.

08 / YOUR KSSLS CRANE PROJECT

Get a quotation for your crane.

Share your paper-machine layout or maintenance-area sketch, the heaviest components and their pickup and landing positions. Add your destination and any available lifting-point details. We can help develop the three-hoist arrangement and prepare a complete equipment quotation.

  • Configuration matched to your lifting task
  • Clear equipment and service scope
  • Delivery and support terms in your offer

info@cranehenanmine.com

PRODUCT SELECTEDKSSLS Three Trolley Electric Hoist Overhead Crane

Not sure about a dimension? Leave it blank.

↑
KSSLS three-trolley hoist craneRequest your project quotation
Get a quotation ↗
KSSLS equipment gallery
Enlarged product image