Project spotlight127-Unit Lifting-Equipment Export Programme Begins for an Egyptian Steel Plant
127 crane and equipment sets for an Egyptian steel plant. First export dispatch began on 3 September 2026.
Follow the dispatchBridge cranes for workshops and production lines.
Explore Overhead Cranes
Ground-supported lifting for yards and construction.
Explore Gantry Cranes
Wire rope and chain hoists for lifting points and cranes.
Explore Electric Hoists

Wire rope lifting and pulling with a powered drum.
Explore Electric Winches
Grab buckets, magnets and hooks for your load.
Explore Lifting Attachments & Grabs
Mobile handling for containers, precast and yard loads.
Explore Rubber-Tired Gantry Cranes & Straddle Carriers

Lift and move vessels through boatyards and marinas.
Explore Marine Travel Lifts
Ladle, slab, scrap and coil handling across steel production.

Container stacking and cargo transfers across terminals and rail.

Turbine installation, powerhouse maintenance and wind equipment assembly.

Controlled component transfer and positioning for precision assembly.

Heavy fabrication, production lifting and factory crane automation.

Process lifting for smelters, carbon blocks and anode materials.

Clean lifting and classified protection for sensitive process areas.

Bridge fabrication, metro construction and ship block assembly.

Automated storage and retrieval for plates, cables and bins.

Follow project dispatches, crane engineering and factory acceptance.

Dispatch, installation and equipment in service

Crane configurations and handling technology

Factory inspections, acceptance and test programmes

Company developments, people and community programmes
Follow crane deliveries, equipment developments and factory inspections. See the work behind your next lifting project.
Project spotlight127 crane and equipment sets for an Egyptian steel plant. First export dispatch began on 3 September 2026.
Follow the dispatchExplore deliveries, engineering and factory quality updates. Company news remains available in the complete archive.
180 updates for crane buyers
No updates match these filters. Try another topic, year or keyword.
Page 16 of 20 · Showing 136–144
Henan Mine supplied eighteen cranes and equipment sets for a CRRC clean-energy development in August 2022.
Read updateSoftware engineer Guo Xianli and his Henan Mine team developed parametric design tools for overhead and gantry cranes.
Read updateHenan Mine’s June 2022 profile of Fang Jianli’s single-girder workshop team describes thirty-eight employees and thirteen years of team development.
Read updateHenan Mine and the national lifting-machinery inspection centre held an emergency drill on 14 June 2022.
Read updateHenan Mine held a factory quality meeting on 14 June 2022, bringing managers and workshop personnel together around defect control.
Read updateHenan Mine profiled Wei Changxin’s electrical-cabinet team during its June 2022 safety programme.
Read updateHenan Mine’s June 2022 profile of electrical-workshop manager Li Chaoyong describes a team of more than forty personnel.
Read updateThe Xinxiang intelligent-crane industry research institute, led by Henan Mine, received its designation at a ceremony on 8 June 2022.
Read updateHenan Mine profiled Fu Heng’s new-design hoist workshop team in May 2022.
Read updateShare the load, working area, lifting height and operating conditions. Site drawings and process layouts help define the equipment.